Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Apply the principles of pavement profiling using a profiler
Apply the principles of pavement profiling using a profiler
Unit of competency
National Code
RIICBS406D
RIICBS406D
State Code
WH071
WH071
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
27/05/2014
Field of Education
030901 - Construction Engineering
Original Release Date
27/05/2014
Nominal Hours
30
Description
This unit describes a participant’s skills and knowledge required to apply the principles of pavement profiling using a profiler in Civil construction. This unit is appropriate for those working in supervisory or technical specialist roles. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and prepare for applying the principles of pavement profiling using a profiler
- 1.1 Access, interpret and apply, the principles of pavement profiling using a profiler, documentation and ensure the work activity is compliant
- 1.2 Obtain, read, interpret, clarify and confirm work requirements
- 1.3 Ensure a job plan is available which makes best use of the available resources and meets the task requirements
- 1.4 Identify the training requirements of team members and develop training plans
2. Ensure appropriate initiation of task is carried out
- 2.1 Confirm that the necessary resources are available
- 2.2 Ensure clear and timely instructions are communicated to team members and others involved
- 2.3 Ensure appropriate set out of tasks
3. Oversee the execution of tasks
- 3.1 Monitor task performance to ensure it achieves the required outcomes
- 3.2 Initiate adjustments to work practices or job plan and ensure safe execution of work and achievement of required outcomes
- 3.3 Ensure plant equipment and tools maintenance requirements are carried out and recorded
- 3.4 Implement training plans
4. Report on the execution of tasks
- 4.1 Complete and submit reports as required
- 4.2 Recommend changes to improve the safety, efficiency and effectiveness of the execution of pavement profiling using a profiler
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OBO87 | RIICBS406E | Supervise pavement profiling operations using a profiler | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J637 | RII40813 | Certificate IV in Civil Construction Design | Qualification |
| AZF5 | RII40815 | Certificate IV in Civil Construction Design | Qualification |
| AZE3 | RII50515 | Diploma of Civil Construction Design | Qualification |
| J666 | RII50513 | Diploma of Civil Construction Design | Qualification |
| J663 | RII40613 | Certificate IV in Civil Construction Operations | Qualification |
| AZA5 | RII40615 | Certificate IV in Civil Construction Operations | Qualification |
| AZC9 | RII40715 | Certificate IV in Civil Construction Supervision | Qualification |