Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Maintain tanks and water storage assets
Maintain tanks and water storage assets
Unit of competency
National Code
NWP245B
NWP245B
State Code
D1862
D1862
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
14/01/2009
Field of Education
030717 - Plant And Machine Operations
Original Release Date
14/01/2009
Nominal Hours
40
Description
This unit of competency describes the outcomes required to maintain and repair tanks and water storage assets, including reservoirs, balancing storages, sand dams and ring dams.
Notes
Elements and Performance Criteria
1Plan and prepare for work.
- 1.1 Determine work requirements for maintenance and repair of tanks and water storage assets from specifications and instructions.
- 1.2 Plan work according to job requirements using relevant plans, drawings, standards and technical data.
- 1.3 Check coordination issues with relevant personnel, including isolations and permits to work.
- 1.4 Identify, check and prepare materials, equipment and resources required to satisfy job plan according to legislative and organisational requirements.
- 1.5 Select, fit and use personal protective equipment.
2Clean and maintain water tanks and water storage assets.
- 2.1 Monitor, operate and tag flow-regulating devices to isolate tanks according to organisational requirements.
- 2.2 Use safety equipment and follow safety procedures for entry into storages.
- 2.3 Carry out de-silting processes and clean and flush assets according to organisational requirements.
- 2.4 Repair minor structural damage to storage assets and tanks and identify and report major faults according to organisational procedures.
- 2.5 Check and operate flow-regulating devices to return tank to service.
- 2.6 Check maintenance and repairs to tanks and water storage assets to ensure specifications are met.
- 2.7 Check level sensing equipment and alarms to ensure effective operation.
3Review, report and record work.
- 3.1 Check, maintain and store equipment, tools and materials according to manufacturer guidelines and organisational procedures.
- 3.2 Restore work site to meet environmental and organisational requirements.
- 3.3 Maintain workplace records as required.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Work requirements may include:
work site boundaries
types of tanks and assets to be maintained or repaired
methods to be used
risk assessment and preventative measures
Tanks and water storage assets may include:
pipes
valves
controlling equipment of polyvinyl chloride (PVC)
polyethylene
mild steel cement lined
ductile iron cement lined
cast iron cement lined
asbestos cement
copper
glass reinforced piping
structures, including:
meter pits
person access chambers or pits
valve chambers
regulators
erosion barriers
head walls
thrust blocks
fittings, including:
hydrants
sluices
scours
main taps
jointing systems for pipe types, e.g. gibault
tapping bands
tension bands
solvent cement joints
compression ring joints
bolted flanges
electrofusion
welded
cathodic protection
Equipment used may include:
hand and power tools
lifting and winching equipment
mechanical excavation equipment
pneumatic and motorised equipment, including:
compressors
pneumatic spades and attachments
motorised cutting equipment
on- and off-road vehicles
portable pumps
communication equipment
breathing apparatus
gas detection equipment
rescue equipment
appropriate personal protective equipment
Legislative and organisational requirements may include:
relevant federal and state or territory legislation and regulations
codes of practice, associated standards and guidance material
documented organisational policies, manuals and induction programs
relevant community planning and development agreements, such as land care agreements
Work requirements may include:
work site boundaries
types of tanks and assets to be maintained or repaired
methods to be used
risk assessment and preventative measures
Tanks and water storage assets may include:
pipes
valves
controlling equipment of polyvinyl chloride (PVC)
polyethylene
mild steel cement lined
ductile iron cement lined
cast iron cement lined
asbestos cement
copper
glass reinforced piping
structures, including:
meter pits
person access chambers or pits
valve chambers
regulators
erosion barriers
head walls
thrust blocks
fittings, including:
hydrants
sluices
scours
main taps
jointing systems for pipe types, e.g. gibault
tapping bands
tension bands
solvent cement joints
compression ring joints
bolted flanges
electrofusion
welded
cathodic protection
Equipment used may include:
hand and power tools
lifting and winching equipment
mechanical excavation equipment
pneumatic and motorised equipment, including:
compressors
pneumatic spades and attachments
motorised cutting equipment
on- and off-road vehicles
portable pumps
communication equipment
breathing apparatus
gas detection equipment
rescue equipment
appropriate personal protective equipment
Legislative and organisational requirements may include:
relevant federal and state or territory legislation and regulations
codes of practice, associated standards and guidance material
documented organisational policies, manuals and induction programs
relevant community planning and development agreements, such as land care agreements
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to perform maintenance and repair work on tanks and water storage assets by:
planning and preparing work site
performing maintenance and repair tasks according to manufacturer specifications and organisational requirements
checking work, restoring work site, storing equipment and completing documentation
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator and cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to perform maintenance and repair work on tanks and water storage assets by:
planning and preparing work site
performing maintenance and repair tasks according to manufacturer specifications and organisational requirements
checking work, restoring work site, storing equipment and completing documentation
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator and cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| M1872 | NWP245A | Maintain reservoirs, tanks, pump stations and water storage assets | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| A109 | UEE21311 | Certificate II in Remote Area Essential Service | Qualification |
| D244 | NWP20107 | Certificate II in Water Operations | Qualification |