Unit of competency Outline
Date retreived
22/07/2026 3:58 PM AWST
22/07/2026 3:58 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Maximise energy efficiency through applied trade skills
Maximise energy efficiency through applied trade skills
Unit of competency
National Code
CPCSUS4003A
CPCSUS4003A
State Code
WI778
WI778
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
030905 - Building Services Engineering
Original Release Date
20/06/2014
Nominal Hours
35
Description
This unit of competency specifies the outcomes required to undertake a trade using techniques and practices aimed at achieving high levels of energy efficiency in the finished work. Energy efficiency requirements may be specified by legislation or building codes, or commissioned by a client or a site manager. The unit may include working with others and as a member of a team.
Notes
Elements and Performance Criteria
1 Identify energy efficiency aims of the project.
- 1.1 Building science principles are used to identify the energy efficiency expectations of the work based on plans, drawings and specifications.
- 1.2 Relevant personnel and stakeholders are consulted to confirm the building envelope and energy efficiency requirements of the work, and identify specific instructions on priority areas.
- 1.3 Limitations to achieving the energy efficiency requirements are identified and communicated to relevant personnel in order to identify appropriate solutions.
2 Prepare for task.
- 2.1 Products and materials are identified based on building science knowledge and according to project energy efficiency specifications, substitutions are checked for comparable energy efficiency characteristics, and are approved with relevant personnel before use.
- 2.2 Plant, tools and equipment selected to carry out tasks are consistent with building science principles and the requirements of the job to deliver energy efficient outcomes.
- 2.3 Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- 2.4 Material quantity requirements are calculated according to plans, specifications and energy efficiency.
- 2.5 Differences in standard practice to achieving energy efficient outcome are identified and factored into work plan to gain approval, and task timeframe is adjusted where appropriate.
3 Perform tasks using energy efficient techniques.
- 3.1 Unnecessary waste of products and materials is avoided through the use of energy efficient techniques, and greenhouse gas emissions are specifically minimised or eliminated.
- 3.2 Products and materials are handled and used according to manufacturer specifications to ensure energy efficiency ratings are maintained when installed.
- 3.3 Planned cavities and openings created in the building envelope during the project are minimised or sealed to avoid unnecessary air leakages.
- 3.4 Opportunities for achieving energy efficiency outcomes by minimising energy leakages are maximised by communicating with others on site when required.
4 Finalise and evaluate work.
- 4.1 Assessment by qualified energy assessor of work undertaken is arranged to confirm extent of energy efficiency outcomes achieved.
- 4.2 Improvements required in own work practices to ensure energy efficiency outcomes are identified and noted for future development.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Building science principles mustinclude:
building envelope
effective ventilation
heat, air and moisture flows:
conduction
convection
radiation
interaction between occupants, building components and systems, and the environment both indoors and out
moisture management.
Energy efficiency expectations may include:
acoustic insulation between zones and rooms
achieving relevant energy efficient requirements in the National Construction Code, and other relevant codes and regulations
achieving or maintaining a home energy rating, commercial building rating, or equivalent energy rating or industry standards and regulations
effectively selecting and using thermal mass
energy conservation
minimising infiltration
minimising the heat loss and maximising the heat gain based on the requirements of the building reflective of the climatic zones
minimising thermal bridging
passive solar design approach
reducing or minimising energy costs and consumption to heat and cool the building
thermal resistance
ventilation, heat and energy recovery
zero energy homes.
Relevant personnel and stakeholders may include:
architect
builder
developer
draftsperson
energy assessor
energy modeller
facility manager
heating, ventilation and air conditioning (HVAC) designer
HVAC engineer
manufacturer
other trades working at the site
owner
project manager
site manager
supplier.
Building envelope must include:
building enclosure or shell
the area separating the internal conditioned air from the outside unconditioned air
the roof, walls, windows and doors.
Materials may include:
building and construction materials, including:
aerated autoclaved concrete products
bricks
cement
concrete
mortar
plaster
plasterboard
plumbing
roofing materials
steel
timber
building envelope - ceiling, floor, windows and wall insulating materials:
air barriers
batts
expanded polystyrene
joining tape
reflective foils
sealant
vapour barriers.
Energy efficient techniques mayinclude:
advanced framing or optimal value engineering for energy efficient framing
appropriate selection and installation of insulation without compressing it
conserving energy by effectively sealing the building envelope to minimise air leakage (exfiltration and infiltration) in the building envelope, shell or enclosure
effectively installing windows and flashing without breaking the building envelope
effectively selecting and installing thermal insulation
minimising embodied energy
sealing, insulating and minimising duct leakage
sealing leaky joints
selecting recycled materials to minimise production energy
sourcing materials or products locally to minimise transport energy.
Building science principles mustinclude:
building envelope
effective ventilation
heat, air and moisture flows:
conduction
convection
radiation
interaction between occupants, building components and systems, and the environment both indoors and out
moisture management.
Energy efficiency expectations may include:
acoustic insulation between zones and rooms
achieving relevant energy efficient requirements in the National Construction Code, and other relevant codes and regulations
achieving or maintaining a home energy rating, commercial building rating, or equivalent energy rating or industry standards and regulations
effectively selecting and using thermal mass
energy conservation
minimising infiltration
minimising the heat loss and maximising the heat gain based on the requirements of the building reflective of the climatic zones
minimising thermal bridging
passive solar design approach
reducing or minimising energy costs and consumption to heat and cool the building
thermal resistance
ventilation, heat and energy recovery
zero energy homes.
Relevant personnel and stakeholders may include:
architect
builder
developer
draftsperson
energy assessor
energy modeller
facility manager
heating, ventilation and air conditioning (HVAC) designer
HVAC engineer
manufacturer
other trades working at the site
owner
project manager
site manager
supplier.
Building envelope must include:
building enclosure or shell
the area separating the internal conditioned air from the outside unconditioned air
the roof, walls, windows and doors.
Materials may include:
building and construction materials, including:
aerated autoclaved concrete products
bricks
cement
concrete
mortar
plaster
plasterboard
plumbing
roofing materials
steel
timber
building envelope - ceiling, floor, windows and wall insulating materials:
air barriers
batts
expanded polystyrene
joining tape
reflective foils
sealant
vapour barriers.
Energy efficient techniques mayinclude:
advanced framing or optimal value engineering for energy efficient framing
appropriate selection and installation of insulation without compressing it
conserving energy by effectively sealing the building envelope to minimise air leakage (exfiltration and infiltration) in the building envelope, shell or enclosure
effectively installing windows and flashing without breaking the building envelope
effectively selecting and installing thermal insulation
minimising embodied energy
sealing, insulating and minimising duct leakage
sealing leaky joints
selecting recycled materials to minimise production energy
sourcing materials or products locally to minimise transport energy.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by performing a range of tasks in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
undertake three different tasks within the relevant trade specification, using principles or techniques that are designed to maximise the energy efficiency characteristics of the building or project
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and work health and safety (WHS) legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality, environmental and sustainability requirements
safely and effectively operate and use tools, plant and equipment and handle materials and components
communicate and work effectively and safely with others.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
research resources, including industry-related systems information
safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using one or more of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function, such as
CPCCCM1012A Work effectively and sustainably in the construction industry
CPCSUS4001A Implement and monitor environmentally sustainable work practices
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Overview of assessment
This unit of competency could be assessed by performing a range of tasks in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
undertake three different tasks within the relevant trade specification, using principles or techniques that are designed to maximise the energy efficiency characteristics of the building or project
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and work health and safety (WHS) legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality, environmental and sustainability requirements
safely and effectively operate and use tools, plant and equipment and handle materials and components
communicate and work effectively and safely with others.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
research resources, including industry-related systems information
safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using one or more of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function, such as
CPCCCM1012A Work effectively and sustainably in the construction industry
CPCSUS4001A Implement and monitor environmentally sustainable work practices
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCM07 | CPCSUS4003 | Maximise energy efficiency through applied trade skills | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W740 | CPC40110 | Certificate IV in Building and Construction (Building) | Qualification |
| W975 | CPP40611 | Certificate IV in Property Services (Operations) | Qualification |