Unit of competency Outline

Date retreived
23/07/2026 12:21 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Construct and maintain underground roads

Construct and maintain underground roads

Unit of competency
National Code
RIIUMM304A
State Code
WB312
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
22/06/2011
State Implementation and Classification
Approved Date
24/11/2011
Field of Education
030303 - Mining Engineering
Original Release Date
24/11/2011
Nominal Hours
40
Description
This unit covers the construction and maintenance of underground roads in the metalliferous mining industry. It includes planning and preparing for road construction and maintenance, constructing roads, maintaining roads, and conducting housekeeping activities. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare for road construction and maintenance
  • 1.1. Access, interpret and apply compliance documentation relevant to the work activity
  • 1.2. Plan and prepare work
  • 1.3. Receive, interpret and clarify shift change over details
  • 1.4. Select personal protective equipment appropriate for work activities
  • 1.5. Select appropriate type of equipment and materials according to job type and specifications to maximise efficiency and effectiveness of work activities
  • 1.6. Perform equipment pre-start checks
  • 1.7. Identify, address and report potential risks and hazards
  • 1.8. Identify, address and report environmental issues
  • 1.9. Adhere to emergency procedures as per site procedures
  • 1.10. Inspect and assess site conditions to determine if scaling is required and take action
  • 1.11. Use approved dust suppression and extraction methods
  • 1.12. Erect signs or barricades and/or safety provisions
  • 1.13. Ensure area is well ventilated before entry into work area
2. Construct roads
  • 2.1. Prepare road surface and apply road material to meet planned road characteristics and engineering specifications
  • 2.2. Construct road to conform with road design and location as specified by work plan
  • 2.3. Check for and remove contaminants
  • 2.4. Construct drains and water crossing points as appropriate for the removal of run-off and avoid accumulation of excessive water to minimise road damage
  • 2.5. Ensure access ways are clear whilst constructing road
  • 2.6. Organise for excess road material to be removed
  • 2.7. Suppress dust utilising approved method
  • 2.8. Complete all required documentation clearly, concisely and on time
  • 2.9. Pass on end of shift information to oncoming shift
3. Maintain roads
  • 3.1. Maintain condition of roads to meet volume of traffic
  • 3.2. Maintain effective drainage for the removal of excess water and ensure safe hauling surface
4. Conduct housekeeping activities
  • 4.1. Check road ensuring site is serviceable
  • 4.2. Carry out shutdown procedures
  • 4.3. Service and make minor adjustments to equipment
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Equipment may include:
compactor
dust suppression equipment
grader
integrated tool carrier
loader
roller
trucks
water trucks
recommended/required PPE
Dust suppression and extraction methods may include:
mobile/fixed sprays
screens (vent doors, vent blinds)
use of water trucks
ventilation bags operational
watering down site
Road material may include:
bitumen
concrete
emulsified oils
gravel
raise borer muck
road base aggregate
sand
select fill
stabilisers and other dust suppressants
Legislation may include Acts and regulation dealing with:
mining safety and health
mine inspection
OHS
explosives
Potential risks and hazards may include:
contaminants (metals, steel rods, vehicles, chemical/physical)
drains
dropper pipes and firing lines
dust
failure to erect barricades and signage
fires
open holes
other equipment and personnel
slippery roads
spillage
unsafe ground
Environmental issues may include:
dust
exhaust emissions
gas emissions
noise
Road may include:
all main travel ways
cross cuts
ore body roads
road
Road surface may include:
fill
flat bedrock
sand
sub-base
Road preparations may include:
clearing
levelling
stripping
Access ways may include:
drives and cross cuts
Drainage may include:
berm
netting
ponds
pumping system
shoulder drains
side drains
sub soil drainage
sumps
T pieces
Checks on road may include:
equipment removed from site
for loose material
relevant personnel notified
surface checks
whether signage and/or barricades have been erected or taken down

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for constructing and maintaining underground roads
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of underground road construction and maintenance
working with others to undertake and complete the construction and maintenance of underground roads that meets all of the required outcomes
consistent timely completion of underground road construction and maintenance that safely, effectively and efficiently meets the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete the construction and maintenance of underground roads
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Replaces
State Code National Code Title Type
W2508 MNMUMS301A Construct and maintain underground roads Unit of competency
Replaced By
State Code National Code Title Type
WH706 RIIUMM304D Construct and maintain underground roads Unit of competency
No information