Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install and replace transoms

Install and replace transoms

Unit of competency
National Code
TLIS2028
State Code
AVH81
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
29/01/2021
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
039907 - Rail Operations
Original Release Date
23/02/2016
Nominal Hours
35
Description
This unit involves the skills and knowledge required to install and replace transoms on underbridges in accordance with safeworking and regulatory requirements, and workplace procedures.It includes preparing for work, installing/replacing transoms and completing documentation.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed under minimal supervision, generally within a team environment.It involves the application of routine operational principles and procedures when installing or replacing transoms, as part of workplace activities across a variety of operational contexts within the Australian rail system.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare for work
  • 1.1 Worksite is identified
  • 1.2 Hazards are identified, risks are assessed and control measures are implemented
  • 1.3 Installation, replacement or repair method is selected to meet work requirements in accordance with workplace procedures
  • 1.4 Plant, equipment and other materials are prepared for work
  • 1.5 Transoms are prepared in accordance with job requirements using correct methods, including dressing and protective coatings
2 Install or replace transoms
  • 2.1 Unserviceable transoms are extracted, as required, using manual or mechanical methods in accordance with workplace procedures
  • 2.2 New transom is installed using manual or mechanical methods in accordance with workplace standards and procedures
  • 2.3 Transom is suitably supported by appropriate methods in accordance with workplace standards and procedures
  • 2.4 Transom fixtures are replaced or tightened as required
  • 2.5 Work is completed to meet track geometry requirements in accordance with rail industry standards and workplace procedures
  • 2.6 Work is checked for compliance with acceptance standards for spacing, skew and geometry
3 Complete documentation
  • 3.1 Required documentation procedures and processes are confirmed
  • 3.2 Documentation is filled in legibly and proofread
  • 3.3 Documentation is processed in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
D5338 TLIS2028A Install and replace transoms Unit of competency