Unit of competency Outline
Date retreived
24/07/2026 7:31 AM AWST
24/07/2026 7:31 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Prepare and start up coated paper processes
Prepare and start up coated paper processes
Unit of competency
National Code
FPPCPP320A
FPPCPP320A
State Code
AUX99
AUX99
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
Field of Education
030717 - Plant And Machine Operations
Original Release Date
Nominal Hours
Description
This unit describes the outcomes required to prepare and start up coated paper processes in the pulp and paper industryGeneral legislation, regulatory, licensing and certification requirements applicable to this unit are detailed in the range statementSpecific high risk licensing requirements for this unit may be applicable and are to be met separately and prior to the achievement of this unit
Notes
Elements and Performance Criteria
1. Determine production requirements
- 1.1. Production requirements are determined within Occupational Health and Safety (OHS) regulations, environmental and safe working requirements/practices, Standard Operating Procedures (SOP), and housekeeping requirements
- 1.2. Production plan is interpreted
- 1.3. Grade specifications and limits are confirmed and communicated to relevant personnel
- 1.4. Process requirements are determined
- 1.5. Process supplies are confirmed available for production
- 1.6. Chemical and material requirements are determined
2. Inspect and prepare systems for startup
- 2.1. Systems are inspected and prepared for startup within OHS regulations, environmental and safe working requirements/practices, SOP, and housekeeping requirements
- 2.2. Isolations (if any) are removed
- 2.3. Pre-startup checks on equipment (e.g. coater and supply systems) are completed
- 2.4. Electrical power and process supplies are confirmed as available for production
- 2.5. Chemical/material delivery system is prepared for operation
- 2.6. Operational settings are made and confirmed within specification
- 2.7. Production ready status is confirmed with relevant personnel
- 2.8. Monitoring devices/systems are checked and confirmed operational
- 2.9. Faults are identified and rectified as required
3. Co-ordinate startup operations
- 3.1. Startup operations are co-ordinated within OHS regulations, environmental and safe working requirements/practices, SOP, and housekeeping requirements
- 3.2. Equipment startups are co-ordinated for production
- 3.3. System functions are co-ordinated and confirmed by monitoring plant, equipment and control system/display monitors
- 3.4. Process operation status is communicated to relevant personnel
- 3.5. Production startup details are logged, recorded or filed
4. Establish and stabilise production and quality processes
- 4.1. Production and quality processes are established and stabilised within OHS regulations, environmental and safe working requirements/practices, SOP, and housekeeping requirements
- 4.2. Processes are monitored and adjusted to rectify variations from specification
- 4.3. Adjustments/modifications are made to stabilise coating quality within specification
- 4.4. Samples are taken as required to ensure product quality requirements are met
- 4.5. Product tests are verified as within specification, where applicable
- 4.6. Process operation, production and quality data is recorded as required
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Productivity requirements may include:
energy efficiency
waste minimisation
evaporation minimisation, including landfill and waste water reduction
environmentally safe waste disposal
consideration of resource utilisation, including fibre efficiency
minimising delays
chemical recovery maximisation
meeting key performance indicators
line speed
handovers
quality checks
meeting output targets i.e. net tonnes per employee per annum
machine/process time availability i.e. time the machine or process is making product
machine/process production rate
Coated paper processes may include:
tail feed systems
chemical and material batching
laminating and coating
splicing
clay plant operation
calender
pre-reeler operations
super calendering
monitoring systems
rewindering
drying systems
internal unloading
combine rollers
testing
Materials and supplies may include:
chemicals and polymers
power
water
additives
steam
labels
felts
equipment
gas
accessories (parts)
air
base paper
Equipment may include:
coater
splicer
pre-reelers
crimpers
calender
super-calender
parent rolls and reels
cranes
pigment
coating makedown plant
starch cooker
slitter
computer systems
electronic screens and alarms
process control systems
analogue and digital instrumentation
fully, automated, semi-automated, manually operated plant and equipment appropriate to the coated paper process
Electronic control systems may include:
Digital Control System (DCS)
touch screens
robotics
Legislation, regulatory, licensing and certification requirements may include:
OHS and environmental requirements (local, state and commonwealth)
activity or task specific high risk licensing requirements
Documentation, procedures and reports may include:
SOP
quality procedures
environmental sustainability requirements/practices
plant manufacturing operating manuals
enterprise policies and procedures
Material Safety Data Sheets (MSDS)
oil or chemical spills and disposal guidelines
plant isolation documentation
safe work documentation e.g. plant clearance, job safety analysis, permit systems
product specifications and schedules
maintenance logs
job sheets
site agreements
safety instructions
process and instrument diagrams
machine manuals
troubleshooting guides
incidents reports
Maintenance may include:
operator level maintenance as per site agreements
operator maintenance schedules
maintenance systems
maintenance suppliers
proactive maintenance strategies e.g. Total Productive Maintenance (TPM), Reliability Centred Maintenance (RCM)
Actions may include:
process adjustments
reporting to authorised person
rectifying problem within level of responsibility
Communications may include
interaction with:
internal/external customers and suppliers
team members
production/service co-ordinators
maintenance services
operator support personnel
operational management
statutory authorities
Situational awareness may include
awareness of:
traffic
pedestrians
location of equipment
product
hazards
obstruction
unexpected movement
Forms of communication may include:
written e.g. log books, emails, incident and other reports, run sheets, data entry
reading and interpreting documentation e.g. SOP, manuals, checklists, drawings
verbal e.g. radio skills, telephone, face to face, handover
non-verbal e.g. hand signals, alarms, observations
signage e.g. safety, access
Sensory information may include:
visual
sound
feel
touch
smell
vibration
temperature
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Productivity requirements may include:
energy efficiency
waste minimisation
evaporation minimisation, including landfill and waste water reduction
environmentally safe waste disposal
consideration of resource utilisation, including fibre efficiency
minimising delays
chemical recovery maximisation
meeting key performance indicators
line speed
handovers
quality checks
meeting output targets i.e. net tonnes per employee per annum
machine/process time availability i.e. time the machine or process is making product
machine/process production rate
Coated paper processes may include:
tail feed systems
chemical and material batching
laminating and coating
splicing
clay plant operation
calender
pre-reeler operations
super calendering
monitoring systems
rewindering
drying systems
internal unloading
combine rollers
testing
Materials and supplies may include:
chemicals and polymers
power
water
additives
steam
labels
felts
equipment
gas
accessories (parts)
air
base paper
Equipment may include:
coater
splicer
pre-reelers
crimpers
calender
super-calender
parent rolls and reels
cranes
pigment
coating makedown plant
starch cooker
slitter
computer systems
electronic screens and alarms
process control systems
analogue and digital instrumentation
fully, automated, semi-automated, manually operated plant and equipment appropriate to the coated paper process
Electronic control systems may include:
Digital Control System (DCS)
touch screens
robotics
Legislation, regulatory, licensing and certification requirements may include:
OHS and environmental requirements (local, state and commonwealth)
activity or task specific high risk licensing requirements
Documentation, procedures and reports may include:
SOP
quality procedures
environmental sustainability requirements/practices
plant manufacturing operating manuals
enterprise policies and procedures
Material Safety Data Sheets (MSDS)
oil or chemical spills and disposal guidelines
plant isolation documentation
safe work documentation e.g. plant clearance, job safety analysis, permit systems
product specifications and schedules
maintenance logs
job sheets
site agreements
safety instructions
process and instrument diagrams
machine manuals
troubleshooting guides
incidents reports
Maintenance may include:
operator level maintenance as per site agreements
operator maintenance schedules
maintenance systems
maintenance suppliers
proactive maintenance strategies e.g. Total Productive Maintenance (TPM), Reliability Centred Maintenance (RCM)
Actions may include:
process adjustments
reporting to authorised person
rectifying problem within level of responsibility
Communications may include
interaction with:
internal/external customers and suppliers
team members
production/service co-ordinators
maintenance services
operator support personnel
operational management
statutory authorities
Situational awareness may include
awareness of:
traffic
pedestrians
location of equipment
product
hazards
obstruction
unexpected movement
Forms of communication may include:
written e.g. log books, emails, incident and other reports, run sheets, data entry
reading and interpreting documentation e.g. SOP, manuals, checklists, drawings
verbal e.g. radio skills, telephone, face to face, handover
non-verbal e.g. hand signals, alarms, observations
signage e.g. safety, access
Sensory information may include:
visual
sound
feel
touch
smell
vibration
temperature
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence should be relevant to the work. It should satisfy the requirements of the elements and performance criteria and include consideration of:
the required knowledge and skills tailored to the needs of the specific workplace
applicable OHS regulations, environmental and safe working requirements/practices, SOP and housekeeping requirements
applicable aspects of the range statement
practical workplace demonstration of skills in preparing and starting up coated paper processes
Context of and specific resources for assessment
A workplace assessment must be used to assess:
the application of required knowledge on the job
the application of skills on the job, over time and under a range of typical conditions that may be experienced in coated paper processes
Access to the full range of equipment involved in integrated continuous manufacturing of coated paper processes in a pulp or paper mill is required
Method of assessment
A combination of assessment methods should be used. The following examples are appropriate for this unit:
observation of applied skills and knowledge on the job
workplace demonstrations via a mock-up or simulation that replicate part/s of the job
answers to written or verbal questions about specific skills and knowledge
third-party reports from relevant and skilled personnel
written evidence e.g. log sheet entries, checklist entries, test results
Assessment processes and techniques must be culturally appropriate and in keeping with the language and literacy capacity of the learner and the work being performed. This includes conducting an assessment in a manner that allows thoughts to be conveyed verbally so that the learner can both understand and be understood by the assessor (e.g. use plain English and terminology used on the job)
A holistic assessment with other units relevant to the pulp and paper industry, mill and job role is recommended
Additional information on approaches to assessment for the pulp and paper industry is provided in the Assessment Guidelines for this Training Package
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence should be relevant to the work. It should satisfy the requirements of the elements and performance criteria and include consideration of:
the required knowledge and skills tailored to the needs of the specific workplace
applicable OHS regulations, environmental and safe working requirements/practices, SOP and housekeeping requirements
applicable aspects of the range statement
practical workplace demonstration of skills in preparing and starting up coated paper processes
Context of and specific resources for assessment
A workplace assessment must be used to assess:
the application of required knowledge on the job
the application of skills on the job, over time and under a range of typical conditions that may be experienced in coated paper processes
Access to the full range of equipment involved in integrated continuous manufacturing of coated paper processes in a pulp or paper mill is required
Method of assessment
A combination of assessment methods should be used. The following examples are appropriate for this unit:
observation of applied skills and knowledge on the job
workplace demonstrations via a mock-up or simulation that replicate part/s of the job
answers to written or verbal questions about specific skills and knowledge
third-party reports from relevant and skilled personnel
written evidence e.g. log sheet entries, checklist entries, test results
Assessment processes and techniques must be culturally appropriate and in keeping with the language and literacy capacity of the learner and the work being performed. This includes conducting an assessment in a manner that allows thoughts to be conveyed verbally so that the learner can both understand and be understood by the assessor (e.g. use plain English and terminology used on the job)
A holistic assessment with other units relevant to the pulp and paper industry, mill and job role is recommended
Additional information on approaches to assessment for the pulp and paper industry is provided in the Assessment Guidelines for this Training Package
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AXH84 | PPMCPP320 | Prepare and start up coated paper processes | Unit of competency |