Unit of competency Outline

Date retreived
22/07/2026 5:51 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Write specifications for refrigeration and air conditioning engineering projects

Write specifications for refrigeration and air conditioning engineering projects

Unit of competency
National Code
UEECD0061
State Code
OCA38
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
05/10/2020
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
080315 - Project Management
Original Release Date
12/07/2021
Nominal Hours
36
Description
This unit involves the skills and knowledge required to write specifications for a refrigeration and air conditioning engineering project.It includes determining refrigeration and air conditioning engineering project specifications, documenting design and technical requirements, and obtaining approval for the project specification.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare refrigeration and air conditioning engineering project specification requirements
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) procedures for relevant work area are identified and applied
  • 1.2 Techniques for specification writing are reviewed and adopted in accordance with workplace procedures
  • 1.3 Scope of the specification is determined using formal evaluation/survey processes
  • 1.4 Criteria from other related works impacting on the specification are determined from relevant documentation, site visits and/or discussions with relevant person/s
2 Write refrigeration and air conditioning engineering project specification
  • 2.1 Specification is developed to include scenarios/requirements determined in consultation with relevant person/s and regulatory requirements
  • 2.2 Specification is developed in collaboration with relevant design professionals and contractors involved in the project
  • 2.3 Competent person/s required for the project is identified and their roles specified in the specification
  • 2.4 Project specification is reviewed and adjusted to rectify any anomalies
  • 2.5 Project specification is developed in accordance with workplace procedures
3 Obtain approval for refrigeration and air conditioning engineering project specification
  • 3.1 Project specification is presented and discussed with relevant person/s
  • 3.2 Alteration/s to project specification resulting from discussions is negotiated with relevant person/s in accordance with workplace procedures
  • 3.3 Project specification is finalised and approval obtained from relevant person/s
No information
No information
Replaces
State Code National Code Title Type
W7860 UEENEEE073B Write specifications for refrigeration and air conditioning engineering projects Unit of competency