Unit of competency Outline

Date retreived
22/07/2026 1:19 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Prepare for and apply shotcrete for installation

Prepare for and apply shotcrete for installation

Unit of competency
National Code
PMC552094B
State Code
WA955
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
30/04/2010
State Implementation and Classification
Approved Date
15/08/2014
Field of Education
040399 - Building, N.e.c.
Original Release Date
15/08/2014
Nominal Hours
40
Description
This unit of competency cover the use of the gunite/shotcrete technique to apply refractory materials. The refractory may be applied by wet or dry processes..
Notes
Elements and Performance Criteria
1. Establish the suitability of resources
  • 1.1. Check all information conforms with resources
  • 1.2. Record discrepancies in information
  • 1.3. Report any inaccuracies in information to the person in charge
  • 1.4. Identify and select materials, components, tools and equipment
2. Apply shotcrete to prepared surface
  • 2.1. Prepare backgrounds, cutting out, demolition and keying
  • 2.2. Mix shotcrete
  • 2.3. Assemble and operate shotcreting equipment
  • 2.4. Apply shotcrete
  • 2.5. Remove and reinstate damaged shotcrete material
  • 2.6. Maintain tools and equipment
3. Contribute to controlling hazards in work area
  • 3.1. Identify hazards in work area
  • 3.2. Assess risks arising from those hazards
  • 3.3. Take appropriate action to control risks to procedures and duty of care
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Procedures
All operations are performed in accordance with standard procedures and work instructions
Shotcrete
Shotcrete is the generic term used to describe the
placement of cementitious products such as
concrete or refractory monolithics, by high volume and high velocity air
Tools and equipment
Tools and equipment include:
mixing equipment
air compressors
water addition equipment
gunning equipment/nozzles
equipment allowing access
Installation
Installation includes:
correct thickness of course
correct compaction
conforming to required curves and angles
tying to structure
keying to existing refractory
Occupational health and safety (OHS)
All operations are subject to stringent OHS requirements and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and OHS requirements, the OHS requirements take precedence
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment
The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency.

Critical aspects for assessment and evidence required to demonstrate competency in this unit
Competence must be demonstrated in the operation of all ancillary equipment to the level required for this unit of competency.
Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action.
Consistent performance should be demonstrated. In particular look to see that:
a uniform coating has been applied
it adheres appropriately the surface
it is of the desired thickness and consistency.

Context of and specific resources for assessment
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations.
Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this unit of competency. Simulation should be based on the actual plant and will include 'walk-throughs' of the relevant competency components. A bank of scenarios/case studies/what ifs and questions will be required to probe the reasoning behind observable actions.

Method of assessment
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units.
It may be appropriate to assess this unit concurrently with other relevant units

Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.
Replaces
State Code National Code Title Type
W2679 PMCOPS294A Prepare for and apply shotcrete for installation Unit of competency
Replaced By
State Code National Code Title Type
BAH29 PMC552094 Prepare for and apply shotcrete for installation Unit of competency