Unit of competency Outline
Date retreived
22/07/2026 4:10 PM AWST
22/07/2026 4:10 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Design gas bulk storage systems
Design gas bulk storage systems
Unit of competency
National Code
CPCPPS5000B
CPCPPS5000B
State Code
WF933
WF933
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040327 - Plumbing
Original Release Date
20/06/2014
Nominal Hours
80
Description
This unit of competency specifies the outcomes required to design gas bulk storage systems, determine relevant installation details and prepare system specifications for a range of residential, commercial and industrial buildings.
Notes
Elements and Performance Criteria
1 Evaluate design parameters.
- 1.1 Scope of workfor gas bulk storage systems is established.
- 1.2 Design requirementsare determined from plans, specifications and client brief.
- 1.3 Cost-benefit analysisis conducted comparing a range of pipe materials and system designs.
- 1.4 Statutory and regulatory requirements and Australian and New Zealand standards for the design of gas bulk storage systems are analysed and applied.
- 1.5 Manufacturer requirementsand trade and technical manuals are interpreted.
- 1.6 Additional research, including a desktop study, is conducted to outline design parameters.
- 1.7 Performance requirements are established.
2 Plan and detail system components.
- 2.1 Layout of a liquefied petroleum gas (LPG) bulk storage installation is determined according to regulatory authorities.
- 2.2 Site plans for bulk installations are prepared, including layout of pipework systems.
- 2.3 Fire protection systems are specified according to Australian and New Zealand standards and deluge systems are detailed.
- 2.4 Control valves and fittings are designed and detailed.
- 2.5 Content gauges are analysed and located according to code requirements, and meters and regulators are specified.
- 2.6 Vaporisers are evaluated and specified and vaporisation rates are calculated.
- 2.7 System calculationsare performed for a range of applications according to regulations and manufacturer requirements.
- 2.8 Pipe fixingsare designed for a range of applications.
- 2.9 Approved materials, jointing methods and installation requirements for gas bulk storage systems are specified.
3 Design and size systems.
- 3.1 Gas bulk storage systems and circuits are designed for a range of applications.
- 3.2 Deluge systems are designed.
- 3.3 Gas bulk storage systems are designed and sized using computer software packages.
4 Prepare documentation.
- 4.1 Plansare prepared for a range of gas bulk storage systems.
- 4.2 Specificationfor a gas bulk storage system is prepared.
- 4.3 Testing and commissioning schedule is prepared.
- 4.4 Operation and maintenance manual is produced.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Scope of work includes:
interpretation of plans and specifications
principles of operation of various types of LPG components and fault conditions in LPG components
sizing and documenting layout of gas bulk storage installations, including fire protection systems, such as:
chemical injection
extinguishers
hose reels
hydrants
monitors
portable and fixed types of firefighting equipment
spray systems.
Design requirements must include:
architectural specifications
builder specifications
owner requirements
specialist gas use applications.
Cost-benefit analysis:
compares the range of suitable materials and system choices available to enable cost-effective choices to be made without compromising integrity of project.
Statutory and regulatory requirements and Australian and New Zealand standards must include:
Acts, regulations and local and state government policies, including group and strata titling
AS/NZS1596 The storage and handling of LP gas
AS2430 Classification of hazardous areas
AS5601 (AG601) Gas installations
National Construction Code.
Manufacturer requirements include:
pump tables
sizing tables
specifications
technical and trade manuals.
Desktop study includes collection and interpretation of existing data for design purposes in:
architectural and building plans
council plans
developer plans
other documents, including:
applications
forms
other reports as available.
Performance requirements must include:
operational and safety requirements, established using Australian and New Zealand standards, and local and state authority plans.
Layout of pipework systems must:
not unduly affect building integrity and aesthetic appeal
have principles of economy, serviceability, durability and fit for use applied.
Control valves and fittings may include:
valves:
applications of valves and code requirements for installation
emergency shutdown valves
excess flow valves
hydrostatic relief valves
individual valve types
fittings:
bends
inspection openings
junctions
meters
reflux valves
staged regulators
traps
vaporisers.
Meters include:
mass flow
positive displacement
turbine.
System calculations must include:
determination of flow and appliance loadings
interpretation of design charts and tables
pipe sizing calculations.
Pipe fixings include:
anchors
bedding
bracket spacing
concrete support
corrosion protection
cover
hanging brackets
material requirements
saddles
wall and ceiling brackets.
Materials include:
concrete
copper
fittings and valves
high density polyethylene (HDPE)
measures to prevent the spread of fire.
Jointing methods include:
brazing
mechanical joints
solvent cement welding
threading.
Installation requirements include:
bedding
clipping
concrete support
installation details
jointing requirements
level of workmanship.
Plans include:
axonometrics
cross-sections
details
elevations
isometrics
schematics, which may be produced using:
computer generation
drawing equipment
sections.
Specification includes:
clipping
details of specialised components
jointing
manufacturer requirements
materials
valves
workmanship.
Testing includes:
air pressure test
gas leak test
quality assurance (QA) audit.
Commissioning schedule must include:
flow testing
leak check
vaporisation rate check.
Operation and maintenance manual may include:
leak detection
regular maintenance requirements
safety inspection
yearly inspection.
Scope of work includes:
interpretation of plans and specifications
principles of operation of various types of LPG components and fault conditions in LPG components
sizing and documenting layout of gas bulk storage installations, including fire protection systems, such as:
chemical injection
extinguishers
hose reels
hydrants
monitors
portable and fixed types of firefighting equipment
spray systems.
Design requirements must include:
architectural specifications
builder specifications
owner requirements
specialist gas use applications.
Cost-benefit analysis:
compares the range of suitable materials and system choices available to enable cost-effective choices to be made without compromising integrity of project.
Statutory and regulatory requirements and Australian and New Zealand standards must include:
Acts, regulations and local and state government policies, including group and strata titling
AS/NZS1596 The storage and handling of LP gas
AS2430 Classification of hazardous areas
AS5601 (AG601) Gas installations
National Construction Code.
Manufacturer requirements include:
pump tables
sizing tables
specifications
technical and trade manuals.
Desktop study includes collection and interpretation of existing data for design purposes in:
architectural and building plans
council plans
developer plans
other documents, including:
applications
forms
other reports as available.
Performance requirements must include:
operational and safety requirements, established using Australian and New Zealand standards, and local and state authority plans.
Layout of pipework systems must:
not unduly affect building integrity and aesthetic appeal
have principles of economy, serviceability, durability and fit for use applied.
Control valves and fittings may include:
valves:
applications of valves and code requirements for installation
emergency shutdown valves
excess flow valves
hydrostatic relief valves
individual valve types
fittings:
bends
inspection openings
junctions
meters
reflux valves
staged regulators
traps
vaporisers.
Meters include:
mass flow
positive displacement
turbine.
System calculations must include:
determination of flow and appliance loadings
interpretation of design charts and tables
pipe sizing calculations.
Pipe fixings include:
anchors
bedding
bracket spacing
concrete support
corrosion protection
cover
hanging brackets
material requirements
saddles
wall and ceiling brackets.
Materials include:
concrete
copper
fittings and valves
high density polyethylene (HDPE)
measures to prevent the spread of fire.
Jointing methods include:
brazing
mechanical joints
solvent cement welding
threading.
Installation requirements include:
bedding
clipping
concrete support
installation details
jointing requirements
level of workmanship.
Plans include:
axonometrics
cross-sections
details
elevations
isometrics
schematics, which may be produced using:
computer generation
drawing equipment
sections.
Specification includes:
clipping
details of specialised components
jointing
manufacturer requirements
materials
valves
workmanship.
Testing includes:
air pressure test
gas leak test
quality assurance (QA) audit.
Commissioning schedule must include:
flow testing
leak check
vaporisation rate check.
Operation and maintenance manual may include:
leak detection
regular maintenance requirements
safety inspection
yearly inspection.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
evaluating and documenting design parameters, including client, regulatory, manufacturer and Australian and New Zealand standard requirements for a range of gas bulk storage systems
planning and detailing system components, including:
meters
pipes
regulators
valves
vaporisers
designing a deluge system
designing and sizing gas bulk storage systems using appropriate software
preparing plans for a range of gas bulk storage systems to industry standards
preparing specifications for gas bulk storage system installations
preparing testing and commissioning schedules
producing operation and maintenance manuals.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards’ requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices and relevant to planning processes, including calculators
support materials appropriate to activity, including computers and software
workplace instructions relating to safe working practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry-related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
evaluating and documenting design parameters, including client, regulatory, manufacturer and Australian and New Zealand standard requirements for a range of gas bulk storage systems
planning and detailing system components, including:
meters
pipes
regulators
valves
vaporisers
designing a deluge system
designing and sizing gas bulk storage systems using appropriate software
preparing plans for a range of gas bulk storage systems to industry standards
preparing specifications for gas bulk storage system installations
preparing testing and commissioning schedules
producing operation and maintenance manuals.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards’ requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices and relevant to planning processes, including calculators
support materials appropriate to activity, including computers and software
workplace instructions relating to safe working practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry-related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCN35 | CPCPPS5000 | Design gas bulk storage systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J499 | CPC50612 | Diploma of Hydraulic Services Design | Qualification |
| J498 | CPC50412 | Diploma of Plumbing and Services | Qualification |