Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Grind rail on tram/light rail systems
Grind rail on tram/light rail systems
Unit of competency
National Code
TLIW3042
TLIW3042
State Code
AVH29
AVH29
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
039907 - Rail Operations
Original Release Date
23/02/2016
Nominal Hours
15
Description
This unit involves the skills and knowledge required to grind rail welds and faults on tram or light rail systems in accordance with approved standards, safeworking and regulatory requirements, and organisational procedures.It includes determining job requirements, grinding weld and/or weld repair, grinding rail to repair surface defects and completing required documentation.This competency relates to grinding new welds and welded repairs on the rail and check rail, grinding out corrugations and re-profiling the rail.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Determine job requirements
- 1.1 New welds and weld repairs are located
- 1.2 Corrugations on the rail are identified
- 1.3 Hazards are identified, risks are assessed and control measures are implemented
- 1.4 Appropriate equipment is selected
- 1.5 Appropriate repair method and/or profile is selected to ensure completed work will meet specifications
- 1.6 Site is cleared of obstructions and combustible material
2 Grind weld repair
- 2.1 Rail and check rail are ground to profile using approved equipment in accordance with workplace procedures
- 2.2 Grinding equipment is operated safely in accordance with work health and safety (WHS)/occupational health and safety (OHS) and environmental requirements
- 2.3 Rail profile and vertical and horizontal alignment are measured to ensure compliance with acceptance standards
- 2.4 Rail surface condition is assessed for compliance with rail industry standards
3 Grind rail to repair corrugations
- 3.1 Rail is ground using approved equipment in accordance with workplace procedures
- 3.2 Grinding equipment is operated safely in accordance with WHS/OHS and environmental requirements
- 3.3 Finished surface is checked to ensure compliance with specifications
4 Re-profile rail
- 4.1 Rail is re-profiled using approved equipment in accordance with workplace procedures
- 4.2 Equipment is operated safely in accordance with WHS/OHS and environmental requirements
- 4.3 Finished surface is checked to ensure ground profile complies with organisational requirements and specifications
5 Complete documentation
- 5.1 Required documentation procedures and processes are confirmed
- 5.2 Documentation is filled in legibly and proofread
- 5.3 Documentation is processed in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WG248 | TLIW3042A | Grind rail on tram/light rail systems | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCY73 | TLIW0003 | Grind rail on tram/light rail systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AWS4 | TLI32915 | Certificate III in Tram or Light Rail Infrastructure | Qualification |
| BDR5 | TLI32918 | Certificate III in Tram or Light Rail Infrastructure | Qualification |