Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Fit off sprinkler heads, controls and ancillary equipment

Fit off sprinkler heads, controls and ancillary equipment

Unit of competency
National Code
CPCPFS3045A
State Code
WI768
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
17/01/2014
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040327 - Plumbing
Original Release Date
20/06/2014
Nominal Hours
24
Description
This unit of competency specifies the outcomes required to install sprinkler heads, system controls and ancillary equipment for sprinkler fire protection systems. The installation may involve a new system or an alteration (extension or modification) to an existing system.
Notes
Elements and Performance Criteria
1 Prepare for work.
  • 1.1 Approved plans and specifications are obtained from relevant authority.
  • 1.2 Work health and safety (WHS) requirements associated with fitting off sprinkler heads, system controls and ancillary equipment, and workplace environmental requirements are identified and applied to task planning.
  • 1.3 Quality assurance requirements are identified according to workplace requirements.
  • 1.4 Tasks are planned and sequenced in conjunction with others involved in or affected by the work.
  • 1.5 Tools and equipment for installing sprinkler heads, system controls and ancillary equipment, including personal protective equipment, are selected and checked for serviceability.
  • 1.6 Work area is prepared to support efficient installation of sprinkler heads, system controls and ancillary equipment.
2 Identify installation requirements.
  • 2.1 Class of sprinkler system and associated design data are identified from system design specifications.
  • 2.2 Components are selected according to job requirements, plans and specifications, and other relevant codes and standards.
  • 2.3 Materials and equipment are identified, ordered and collected according to workplace procedures.
  • 2.4 Materials and equipment are checked for compliance with standards, docket and order form, and for acceptable condition.
3 Install sprinkler heads and ancillary equipment.
  • 3.1 WHS requirements, workplace environmental requirements and quality requirements are applied to work tasks.
  • 3.2 When altering existing systems, system is isolated and drained down to allow connection without causing water damage, and then recharged.
  • 3.3 System is set out in compliance with plans, specifications and job instructions.
  • 3.4 Fixings and pipe supports are installed to plans, manufacturer specifications, standards and regulations.
  • 3.5 Sprinkler system components and ancillary equipment are installed according to plans, specifications and standards.
  • 3.6 Sustainability principles and concepts are applied to installation process.
4 Clean up.
  • 4.1 Work area is cleared and waste materials disposed of or recycled according to statutory and regulatory authority requirements.
  • 4.2 Tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and workplace procedures.
  • 4.3 Information is accessed and documentation completed according to regulatory authorities’ and workplace requirements.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Work health and safetyrequirements must comply with commonwealth, state and territory legislation and regulations, and may include:
handling of materials
hazard control
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
electricity
hazardous materials and substances
service lines
surrounding structures and facilities
trip hazards
use of tools and equipment
work site visitors and the public
working at heights
working in proximity to others
use of firefighting equipment
workplace environmental health and safety.
System controls may include:
flow switches
multiple jet controls (MJCs)
pressure switches
solenoids.
Environmental requirements:
cover water quality management
may include:
clean-up protection
stormwater protection
waste management.
Quality assurance requirements may include:
Australian standards
Environment Protection Authority (EPA) requirements
internal company quality assurance policy and risk management strategy
International Standards Organisation (ISO) standards
site safety plans
workplace operations and procedures.
Tools and equipment may include:
chain blocks
cutting and threading equipment
elevated work platforms (EWPs)
forklifts
hand and power tools
hand trolleys
hoists and jacks
hole saws
ladders
lifting and load shifting equipment
manufacturer sprinkler keys
scaffolds
torque wrench
welding equipment.
Sprinkler systems mayinclude:
deluge
dry pipe
pre-action
storage sprinklers
wall wetting
water mist
wet pipe.
Materials mayinclude:
flow switches
MJCs
pressure switches
sprinkler heads
solenoids.
Isolation and draining down must include:
identifying the correct system
isolating:
alarm initiating devices
alarm signalling equipment
control and indicating equipment (CIE)
emergency warning system
water supply
operating the main drain valve
identifying and operating low drain point valves, if present
checking system for residual water pressure
applying drain-down water management techniques to prevent water damage.
Sustainability principles and concepts:
cover the current and future social, economic and environmental use of resources
may include efficient:
energy use
use and recycling of material
water use, harvesting and disposal.
Statutory and regulatory authorities may include:
state or territory statutory authority
statutory plumbing authority.
Information may include:
charts, drawings and sketches
instructions issued by authorised organisational or external personnel
memos
organisation’s work requirements
regulatory and legislative requirements, particularly those relating to:
building codes
WHS and environmental requirements
plumbing regulations
relevant Australian standards
safe work procedures relating to installing sprinkler heads, system controls and ancillary equipment
safety data sheets (SDS)
signage
verbal, written and graphical instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
locate, interpret and apply relevant information, standards and specifications to install sprinkler heads, system controls and ancillary equipment
apply safety requirements throughout the work sequence, including the use of personal protective clothing and equipment
as a minimum the ability to, given the plans and specifications of a simple automated fire sprinkler system, install at least two sprinkler heads, a flow switch and a pressure switch, ensuring:
correct identification of location, design and details of proposed installation
correct selection and use of appropriate processes, tools and equipment
completion of work to specification
compliance with regulations, standards and organisational quality procedures and processes
effective communication with others
safe work practices
application of sustainability principles and concepts.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
safety data sheets, job safety analyses and safe work method statements
research resources, including industry-related systems information.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using one or more of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to identify and interpret the essential underpinning knowledge required for practical application.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Replaces
State Code National Code Title Type
WF874 CPCPFS3033A Fit off sprinkler heads, controls and ancillary equipment Unit of competency
Replaced By
State Code National Code Title Type
OCO21 CPCPFS3045 Fit off sprinkler heads, controls and ancillary equipment Unit of competency