Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Design power system public lighting systems

Design power system public lighting systems

Unit of competency
National Code
UETDRDS004
State Code
ODM77
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
20/09/2021
State Implementation and Classification
Approved Date
21/12/2021
Field of Education
031301 - Electrical Engineering
Original Release Date
21/12/2021
Nominal Hours
126
Description
This unit covers the technical design of public lighting systems. This includes pedestrian and traffic route lighting to relevant Australian Standards utilising appropriate software to generate design conformance.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work. Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Plan for and coordinate the safe design of public lighting systems
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) practices/procedures and environmental and sustainable energy procedures which may influence the design of public lighting systems are reviewed and determined
  • 1.2 Purpose of the design is established and expected outcomes of the work are confirmed with appropriate personnel
  • 1.3 Organisational established procedures on policies and specifications for the design are obtained or established with appropriate personnel
  • 1.4 Equipment/tools and personal protective equipment (PPE) are selected and coordinated based on specified requirements and established procedures
  • 1.5 Work is prioritised and sequenced for the most efficient and effective outcome following consultation with others for completion within acceptable timeframes, to a quality standard and in accordance with established procedures
  • 1.6 Risk control measures are identified, prioritised and evaluated against the work schedule
  • 1.7 Relevant work permits are secured to coordinate the performance of work according to requirements and/or established procedures
  • 1.8 Resources, including equipment, tools and PPE required for the job are identified, scheduled and coordinated and confirmed safe and in technical working order
  • 1.9 Liaison and communication issues with other/authorised personnel, authorities, clients and landowners are resolved and activities coordinated to carry out work
  • 1.10 Site is prepared according to the work schedule and to minimise risk and damage to property, commerce and individuals in accordance with established procedures
  • 1.11 Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities coordinated and authorised where applicable in accordance with established procedures
2 Carry out and coordinate the design of public lighting systems
  • 2.1 Circuit/systems modelling is used to evaluate alternative proposals in accordance with established procedures
  • 2.2 WHS/OHS and sustainable energy principles, functionality and practices to reduce the incidence of accidents and minimise waste are incorporated into the project in accordance with requirements and/or established procedures
  • 2.3 System design decisions are made on the basis of safety and effective outcomes according to requirements and/or established procedures
  • 2.4 Mathematical models of the distribution system are used to analyse the effectiveness of the finished project in accordance with requirements and established procedures
  • 2.5 Technical advice is given to potential hazards, safety risks and control measures so that monitoring and preventative action can be undertaken and/or appropriate authorities consulted, where necessary, in accordance with requirements and established procedures
  • 2.6 Essential knowledge and associated skills are applied to analyse specific data and compare it with compliance specifications to ensure completion of the project within an agreed timeframe according to requirements
  • 2.7 Solutions to non-routine problems are identified and actioned using acquired essential knowledge and associated skills according to requirements
  • 2.8 Quality of work is monitored against personal performance agreement and/or established organisational and professional standards
3 Complete and coordinate the design of public lighting systems
  • 3.1 Final inspections of the design are undertaken to ensure they comply with all requirements and include all specifications and documentations needed to complete the design brief
  • 3.2 Appropriate personnel are notified of completion and reports and/or completion documents are finalised
  • 3.3 Reports and/or completion documents are submitted to relevant personnel/organisations for approval and, where applicable, statutory or regulatory approval
  • 3.4 Approved copies of design documents are issued and records are updated in accordance with established procedures
No information
No information
Replaces
State Code National Code Title Type
OBI12 UETTDRDS38 Design power system public lighting systems Unit of competency
Replaced By
State Code National Code Title Type
OEF17 UETDRDS021 Design public lighting systems Unit of competency