Unit of competency Outline
Date retreived
23/07/2026 5:01 AM AWST
23/07/2026 5:01 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Construct hose and pipe assemblies for competition vehicles
Construct hose and pipe assemblies for competition vehicles
Unit of competency
National Code
AURMTS001
AURMTS001
State Code
AXB89
AXB89
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
13/07/2016
Field of Education
030503 - Vehicle Mechanics
Original Release Date
13/07/2016
Nominal Hours
20
Description
This unit describes the performance outcomes required to construct hose and pipe assemblies for competition vehicles. It involves preparing for the task, selecting the correct assembly procedure, carrying out the assembly, performing post-assembly testing, and completing workplace processes and documentation. It includes calculating material requirements, selecting components, and constructing hose and pipe assemblies.It applies to those working in the motor sport industry.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare for work
- 1.1 Job requirements are determined from competition information
- 1.2 Materials and consumables are selected and checked according to application and procedures to minimise waste material
- 1.3 Tools and equipment are selected and checked for serviceability
- 1.4 Hazards associated with the work are identified and risks are managed
- 1.5 Work area is cleaned and prepared according to job requirements
2. Construct hose and pipe assemblies
- 2.1 Hose and pipe length is measured and material requirements are calculated
- 2.2 Hose and pipe are cut to length according to according to team procedures and safety requirements
- 2.3 Hose and pipe are bent to conform to fitting requirements according to team procedures and safety requirements
- 2.4 Hose and pipe fittings are connected according to component supplier specifications and procedures and team requirements
- 2.5 Hose and pipe assembly is cleaned and pressure-tested according to component supplier specifications, team procedures and safety requirements
3. Complete work processes
- 3.1 Final inspection is made to ensure work is to workplace expectations and vehicle is presented ready for use
- 3.2 Work area is cleaned, waste and non-recyclable material is disposed of and recyclable material is collected
- 3.3 Tools and equipment are checked and stored according to workplace procedures
- 3.4 Surplus components and consumables are tagged and stored
- 3.5 Workplace documentation is processed according to team procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WF291 | AURMTS3001 | Construct hose and pipe assemblies for competition vehicles | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAC7 | AUR30916 | Certificate III in Motor Sport Technology | Qualification |
| BFY6 | AUR30920 | Certificate III in Motor Sport Technology | Qualification |