Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install air handling units
Install air handling units
Unit of competency
National Code
CPCPMS3036
CPCPMS3036
State Code
OCN58
OCN58
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
031315 - Refrigeration And Air Conditioning Mechanics
Original Release Date
01/06/2021
Nominal Hours
12
Description
This unit specifies the skills and knowledge required to install and test air heating, cooling and ventilation plenums or enclosures. In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.
Notes
Elements and Performance Criteria
1 Identify installation requirements.
- 1.1 Access, read and determine install air handling unit installation requirements from job specifications, relevant Australian Standards, codes, manufacturer’s specifications and jurisdictional requirements.
- 1.2 Identify and apply workplace policies and procedures, work health and safety (WHS) and environmental requirements.
2 Prepare for work.
- 2.1 Create a materials list and collect materials.
- 2.2 Select and check serviceability of appropriate tools, equipment and personal protective equipment (PPE).
3 Set out, assemble and test air handling units.
- 3.1 Set out air handling unit in compliance with plans and specifications.
- 3.2 Position components and equipment according to plans and specifications.
- 3.3 Install equipment according to job and manufacturer specifications.
- 3.4 Check assembly for compliance with plans and specifications.
- 3.5 Test air handling unit for correct operation.
- 3.6 Complete documentation according to relevant regulatory requirements and/or workplace requirements.
4 Clean up.
- 4.1 Clear the work area, and dispose of, reuse or recycle materials in accordance with state and territory legislation and workplace policies and procedures.
- 4.2 Clean tools and equipment, check for serviceability and report any damage, and store and secure according to workplace procedures.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WF919 | CPCPMS3036A | Install air handling units | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGC2 | CPC32420 | Certificate III in Plumbing | Qualification |