Unit of competency Outline
Date retreived
22/07/2026 6:00 PM AWST
22/07/2026 6:00 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Repair potholes
Repair potholes
Unit of competency
National Code
RIICRC201D
RIICRC201D
State Code
WH108
WH108
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
28/05/2014
Field of Education
030901 - Construction Engineering
Original Release Date
28/05/2014
Nominal Hours
28
Description
This unit describes a participant’s skills and knowledge required to repair potholes in Civil Construction.This unit is appropriate for those working in operational rolesLicensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare for repair potholes operations
- 1.1 Access, interpret and apply repair potholes documentation and ensure the work activity is compliant
- 1.2 Obtain, read, interpret, clarify and confirm work requirements
- 1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures
- 1.4 Select and wear correct personal protective equipment appropriate for work activities
- 1.5 Obtain, interpret, clarify and apply relevant drawings, job specifications and work instruction prior to proceeding
- 1.6 Identify, obtain, confirm and implement signage requirements
- 1.7 Select and check for faults all plant, tools and equipment to carry out tasks
- 1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
2. Repair potholes
- 2.1 Remove water and loose material from pothole or defective area
- 2.2 Trim pothole/defect and ensure mechanical interlock of repair material
- 2.3 Apply binder to provide adequate adhesion of repair material and waterproofing of repaired area
- 2.4 Place and compact materials to specification
- 2.5 Clean repaired area, remove excess loose materials, and apply sand or binding material where specified
3. Clean up
- 3.1 Clear work area and recycle or dispose of materials
- 3.2 Clean, check, maintain and store tools and equipment
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WB630 | RIICRC201A | Repair potholes | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCX77 | RIICRC201E | Repair potholes | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J669 | RII20813 | Certificate II in Bituminous Surfacing | Qualification |
| AZD2 | RII20815 | Certificate II in Bituminous Surfacing | Qualification |
| BFA5 | RII20819 | Certificate II in Bituminous Surfacing | Qualification |
| BFA8 | RII30919 | Certificate III in Civil Construction | Qualification |
| AZF8 | RII20715 | Certificate II in Civil Construction | Qualification |
| J640 | RII20713 | Certificate II in Civil Construction | Qualification |
| AZB0 | RII30915 | Certificate III in Civil Construction | Qualification |
| AZG2 | RII30815 | Certificate III in Civil Construction Plant Operations | Qualification |
| J664 | RII30813 | Certificate III in Civil Construction Plant Operations | Qualification |