Unit of competency Outline
Date retreived
23/07/2026 5:39 AM AWST
23/07/2026 5:39 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and maintain permaculture water systems
Install and maintain permaculture water systems
Unit of competency
National Code
AHCPER309
AHCPER309
State Code
BAR35
BAR35
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
12/01/2017
Field of Education
059999 - Agriculture, Environmental And Related Studies, N.e.c.
Original Release Date
12/01/2017
Nominal Hours
35
Description
This unit provides the skills and knowledge to install and maintain permaculture water systems, organise resources for installation work, set out and prepare site, install water system components, complete installation work, commission water system systems and communicate with work team members, supervisors, contractors and consultants.All work is carried out to comply with workplace procedures.This unit applies to individuals who work under broad direction and take responsibility for their own work including limited responsibility for the work of others. They use discretion and judgement in the selection and use of available resources and complete routine activities.No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Organise resources for installation work
- 1.1 Identify the construction site and construction method for the permaculture water system according to the permaculture plan
- 1.2 Select materials, tools, equipment and machinery, water storage, movement and filtering systems according to the permaculture design requirements
- 1.3 Check parts and equipment delivered to the site according to system drawings and specifications on the permaculture plan
- 1.4 Check water supply to ensure that it is compatible with system specifications
- 1.5 Carry out pre-operational and safety checks on tools, equipment and machinery according to manufacturer’s specifications
- 1.6 Select, use and maintain suitable safety and personal protective equipment
2. Set out and prepare site
- 2.1 Measure and mark out permaculture water system lines or lay out in accordance with the permaculture plan
- 2.2 Dig trenches, where required, at the specified depth without damage to services, facilities, features and established plants
- 2.3 Ensure that equipment operation and work practices conform with OHS requirements
- 2.4 Observe any regulations and legislative requirements relevant to the situation
- 2.5 Consider the needs of other stakeholders while setting out and preparing the site for permaculture water systems
3. Install permaculture water systems
- 3.1 Interpret the permaculture plan and, where applicable, supervise and monitor work by contractor
- 3.2 Assemble and connect parts of irrigation systems, where used, according to manufacturer’s specifications and the permaculture plan
- 3.3 Install and adjust pump fittings and valves, where used according to manufacturer’s specifications and the permaculture plan
- 3.4 Maintain a clean and safe work area while installation work is carried out
- 3.5 Check that works can be carried out without a licensed plumber and direct work to licensed individuals where required.
4. Complete installation work
- 4.1 Finish off earthworks to permaculture plan specifications
- 4.2 Check the system configuration and capacity matches the installation plan
- 4.3 Remove or dispose of waste material from the site, and restore site to original state in an environmentally aware and safe manner
- 4.4 Clean, maintain and store tools, equipment and machinery
5. Commission permaculture water systems
- 5.1 Prime, start up and flush irrigation and pump systems, where installed, in accordance with the operation manual
- 5.2 Identify and correct any operating faults according to operations manual
- 5.3 Test, calibrate and monitor equipment, where used, according to manufacturer’s specifications
- 5.4 Record or report work outcomes, where appropriate
6. Monitor and maintain permaculture water systems
- 6.1 Regularly check permaculture water systems and monitor for optimum performance
- 6.2 Carry out routine maintenance procedures on permaculture water systems
- 6.3 Carry out repairs on permaculture water systems as required
- 6.4 Install erosion and sediment control measures, if required, in accordance with manufacturer’s recommendation and the permaculture plan
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OFC49 | AHCPER326 | Install and maintain permaculture water management systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BDD1 | AHC33816 | Certificate III in Permaculture | Qualification |