Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Prepare contract documentation for accessible building work

Prepare contract documentation for accessible building work

Unit of competency
National Code
CPPACC5014A
State Code
W9808
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
07/04/2011
State Implementation and Classification
Approved Date
15/09/2014
Field of Education
030905 - Building Services Engineering
Original Release Date
15/09/2014
Nominal Hours
50
Description
This unit specifies the competency required to prepare contract documentation for the performance of accessible building work. Contract documentation consists of the contract, the working drawings and the specifications. Access consultants should ensure that the contract covers the extent of the work involved, the materials to be supplied, the plant to be used and the price to be paid for the work done. The use of appropriate contracts protects the access consultant in delivering services.Access consultants should have an understanding of the types of clauses featured in a building contract. They may wish to seek legal advice to assist them in preparing contract documentation and should also be aware of sources of pre-printed contract forms. Access consultants need to be able to read and interpret contracts and construction drawings and specifications. They need to know the access requirements of the Disability Discrimination Act (DDA) Premises Standard, the DDA Transport Standard, the DDA Education Standard, the Building Code of Australia (BCA) and relevant Australian standards.The unit requires the ability to communicate with builders, building developers, building owners and managers, renovators, interior designers and building designers on the interpretation and implementation of building contracts.
Notes
Elements and Performance Criteria
1Identify the potential contract parties.
  • 1.1 All potential contract parties are identified in accordance with legislative and organisational requirements.1.2 Roles and responsibilities of all contract parties are identified, agreed and documented in accordance with legislative and organisational requirements.
2Determine contract requirements.
  • 2.1 Contract requirements are reviewed, verified and documented in accordance with client, legislative and organisational requirements.2.2 Consultative processes are used to negotiate and confirm contract specifications with the relevant people.2.3 Required contract information is sourced in consultation with relevant people and assessed for currency, accuracy and relevance in accordance with organisational requirements.2.4 Methods for gathering information are selected that are reliable and make efficient use of time and resources, in accordance with organisational requirements.2.5 Personal limitations in assessing contract requirements are identified and assistance is sought as required from the relevant people.
3Prepare contract document.
  • 3.1 The contract is prepared in accordance with contract specifications, and legislative and organisational requirements.3.2 Advice is sought to confirm that the contract captures and addresses identified risks, protects contracted parties and provides a basis for due performance.3.3 The contract is distributed to appropriate persons to check the accuracy of the information and that contract specifications and requirements are clearly addressed and meet legislative requirements.3.4 Situations requiring specialist advice are identified and assistance is sought as required in accordance with organisational requirements.
4Assemble contract documentation.
  • 4.1 Contract document, working drawings and specifications are collated and assembled in readiness for formal consideration in accordance with organisational requirements.4.2 Associated correspondence for submission to contract parties is prepared in accordance with organisational requirements.4.3 Contract documentation is forwarded to the contract parties for agreement and signing in accordance with organisational requirements.
5Finalise contract.
  • 5.1 The contract is finalised within agreed timeframes and in accordance with client, organisational and legislative requirements.5.2 Any gaps or deficiencies are identified and appropriate actions are implemented in accordance with client, organisational and legislative requirements.5.3 Signed copies of the contract are distributed to all contract parties in accordance with legislative and contractual requirements.5.4 All information is recorded, and a copy of the contract documentation is retained for future reference and maintained securely with due regard to confidentiality in accordance with legislative and organisational requirements.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the performance criteria is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Contract parties may include:
principal
builder
superintendent (where relevant).
Legislative requirements may include:
AS2421 for simple contracts between the principal and the builder
AS4000 for contracts between the principal and the builder where a third party (e.g. a superintendent), ensures that all agreements are met
BCA
DDA Education Standard
DDA Premises Standard
DDA Transport Standard
environmental protection
insurance
occupational health and safety (OHS)
privacy
trade practices
consumer protection
workers compensation insurance.
Organisational requirements may be outlined and reflected in:
access and equity policy, principles and practices
business and performance plans
client service policies, procedures and standards
codes of conduct and codes of practice
communication channels and reporting procedures
communication of services offered
complaint and dispute resolution procedures
compliance with legislation, codes and workplace standards
continuous improvement processes and standards
defined resource parameters
duty of care
employer and employee rights and responsibilities
ethical standards
legal policies and guidelines
OHS policies, procedures and programs
organisational mission statement, goals, objectives, plans, systems and processes
policies and procedures relating to the setting of fees and the negotiation and management of contracts
policies and procedures relating to own role, responsibilities and delegation
privacy and confidentiality policies and procedures
quality assurance and procedures manuals
records and information management systems and processes
style guides and other guides used to prepare documents.
Consultative processes may include:
face to face meetings
telephone conversations
written communication (e.g. facsimile and email).
Relevant people may include:
supervisors
colleagues
clients
parties to contract
legal representatives
government agencies
industry regulators
industry associations.
Required contract information may include:
date, name of principal, name of contractor, names of witnesses
work to be done, incorporating special instructions and reference to working documents and specifications
contract price and type of contract (e.g. fixed price, rise and fall, or cost plus)
earliest and latest dates for contractor to commence work
method of paying the contractor
statement that the contractor shall be responsible for the payment of all wages to workers before a progress claim is made

provisions for variations to the contract
hours of work
payment of fees to statutory bodies
payment of required insurances e.g. statutory building insurance, workers compensation, public liability and professional indemnity
default protection clauses for protection of the principal and the contractor
clause defining responsibilities regarding scaffolding
provisions for sending and receiving formal notices between the principal and the contractor
clause requiring agreement with the principal before the contractor appoints any subcontractor
provision for the removal of incompetent or misbehaving workers
provision requiring the contractor to meet all conditions in any industrial award or industrial agreement relevant to the work
clause requiring contractor to maintain a clean and tidy site that complies with the requirements of environmental protection legislation
provision requiring each contractor or subcontractor to indemnify each other against damage caused to their work
a statement of quality of required workmanship and finish
a defined defects liability period
provision defining access to the contractor's work by third parties e.g. statutory authorities, lending authorities and the principal
provision for settling unresolved disputes.
Resources may include:
tools and equipment
materials
personnel
training
transport.
Risks may relate to:
failure of a contracted party to comply with contract terms and conditions
loopholes in contracts
physical, financial or human resources
competition
market influences
client/staff dissatisfaction (e.g. complaints)
health and safety
fire and security
project control and cash flow
suppliers and contractors
changes to regulations and legislation
time constraints
emergencies and disasters.
Appropriate person may include:
law firm
business partner or colleague
staff member
professional association.
Specialist advicemay be sought from:
solicitors/legal representatives
supervisors and colleagues
technical experts
government officials
industry professionals and associations.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the Assessment Guidelines for this Training Package.
Overview of assessment
This unit of competency could be assessed on its own or as part of an integrated assessment activity involving other competencies relevant to the job function.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
recognising the needs and desires of people with disabilities to engage fully in all aspects of society, and their right to do so
interpreting accurately the impacts of the full range of disabilities and the limitations that each disability places on the individual's ability to access the environment
interpreting accurately how the full range of environmental barriers impact on any of the impairments that people with disabilities might have
applying building legislation and contract legislation
incorporating accurately the requirements of plans and specifications into all contract documentation
finalising contracts for accessible building work within agreed timeframes
applying organisational management policies and procedures, including quality assurance requirements
integrating risk management principles into the development of contracts.
Context of and specific resources for assessment
Resource implications for assessment include:
a registered provider of assessment services
competency standards
assessment materials and tools
suitable assessment venue/equipment
workplace documentation
candidate special requirements
cost and time considerations.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice with a decision of competence only taken at the point when the assessor has complete confidence in the person's competence
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be current and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit.
Replaced By
State Code National Code Title Type
ODJ50 CPPACC5014 Prepare contract documentation for accessible building work Unit of competency
State Code National Code Title Type
W980 CPP50711 Diploma of Access Consulting Qualification