Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Plan and monitor board conversion

Plan and monitor board conversion

Unit of competency
National Code
FPISAW4204B
State Code
D6089
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
20/05/2011
State Implementation and Classification
Approved Date
25/06/2012
Field of Education
030113 - Cabinet Making
Original Release Date
25/06/2012
Nominal Hours
50
Description
This unit describes the outcomes required to plan the production of boards and cutting patterns, coordinate sawing processes and monitor equipment and outputGeneral workplace legislative and regulatory requirements apply to this unit; however there are no specific licensing or certification requirements at the time of publication
Notes
Elements and Performance Criteria
1. Plan conversion operations
  • 1.1. Applicable Occupational Health and Safety (OHS), environmental, legislative and organisational requirements relevant to planning and monitoring board conversion are identified and followed
  • 1.2. Variations in timber characteristics are assessed, recorded and reported to sawyers
  • 1.3. Board conversion schedules are produced and applied in line with site procedures
  • 1.4. Flitch and cant management procedures including order information are planned, scheduled and communicated to sawyers
  • 1.5. Cutting patterns are planned and prescribed in line with site procedures and environmental requirements
  • 1.6. Communication with others is established and maintained in line with OHS requirements
2. Monitor board conversion performance
  • 2.1. Standard cutting patterns are reviewed for suitability to planned cutting schedules
  • 2.2. Board cutting processes are monitored for effectiveness of cutting pattern and condition of timber
  • 2.3. Assistance is provided to sawyers with the evaluation of flitches or cants and sawing problems
  • 2.4. Board management and output are monitored to record possible process improvements
  • 2.5. Unsuitable flitches or cants are rejected and disposed of in line with site procedures and environmental requirements
  • 2.6. Board conversion, major problems and equipment faults are investigated, recorded and reported in line with site requirements
3. Coordinate board conversion
  • 3.1. Cutting operations and output are monitored to record and action possible process improvements based on cutting patterns and timber being processed
  • 3.2. Modifications are made to cutting patterns or schedules to ensure optimum performance and communicated to operators
  • 3.3. Cutting improvement modifications are documented and communicated in line with site procedures
  • 3.4. Cutting output details are obtained and recorded in line with site requirements
  • 3.5. Converted boards are directed to storage or transferred for further processing
  • 3.6. Operating logs and cutting records are completed and maintained to site standards
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
OHS requirements:
are to be in line with applicable Commonwealth, State or Territory legislation and regulations, and organisational safety policies and procedures, and may include:
personal protective equipment and clothing
safety equipment
first aid equipment
fire fighting equipment
hazard and risk control
fatigue management
elimination of hazardous materials and substances
safe forest practices including required actions relating to forest fire
manual handling including shifting, lifting and carrying
Environmental requirements may include:
legislation
organisational policies and procedures
workplace practices
Legislative requirements:
are to be in line with applicable Commonwealth, State or Territory legislation, regulations, certification requirements and codes of practice and may include:
award and enterprise agreements
industrial relations
Australian Standards
confidentiality and privacy
OHS
the environment
equal opportunity
anti-discrimination
relevant industry codes of practice
duty of care
Organisational requirements may include:
legal
organisational and site guidelines
policies and procedures relating to own role and responsibility
quality assurance
procedural manuals
quality and continuous improvement processes and standards
OHS, emergency and evacuation procedures
ethical standards
recording and reporting requirements
equipment use and maintenance and storage requirements
environmental management requirements (waste minimisation and disposal, recycling and re-use guidelines)
Records and reports may include:
planning and monitoring outcomes
operating logs
cutting records
material movement
despatch outcomes
storage locations
quality outcomes
hazards
incidents
equipment malfunctions
and may be:
manual
using a computer-based system or another appropriate organisational communication system
Sawyers
are the operators who use the saws to saw boards
Board conversion
is the process of producing boards by re-sawing green flitches or cants to optimise single boards maximising the amount of boards per flitch or cant
Flitch and cant management is to include:
assessing individual flitches or cants for the most suitable cutting sequence and pattern
assessing which type of boards can be cut from the flitch or cant
Communication may include:
verbal and non-verbal language
constructive feedback
active listening
questioning to clarify and confirm understanding
use of positive, confident and cooperative language
use of language and concepts appropriate to individual social and cultural differences
control of tone of voice
body language
Cutting patterns
is the way in which the flitch or cant is cut up to achieve the output boards planned for that log
Output is to include:
what is produced from a flitch or cant in relation to:
size
volume recovery
sawn finish
dimensional consistency
quality of boards
Disposing of may include:
recycling unsuitable flitches or cants
re-using unsuitable flitches or cants
Storage may include:
storage racks
storage bays
bins
stacks
pallet boxes
modularised storage components
temporary stacking bays (stand, frame or ground)
and may be divided into:
standard product classification
product designation
size
dimension
stack number
weight
grade
shelf life
stock rotation position
Transferral may include:
the use of:
conveyor belt systems
track systems
lifting equipment
lifting equipment may include:
fork lifts
slings
trolley jacks
gantry cranes
loaders
assistance with lifting may include:
the involvement of two or more personnel to lift materials manually or to guide the movement of mechanical equipment
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
A person who demonstrates competency in this unit must be able to provide evidence that they can safely and efficiently plan and monitor board conversion in line with organisational requirements
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to, and satisfy, all of the requirements of the elements of this unit and include demonstration of:
following applicable Commonwealth, State or Territory legislative and regulatory requirements and codes of practice relevant to planning and monitoring board conversion
following organisational policies and procedures relevant to planning and monitoring board conversion
planning and monitoring board conversion for the enterprise
modifying cutting patterns and schedules for board conversion within the enterprise
coordinating personnel to follow planning, communications and scheduling for board conversion
Context of and specific resources for assessment
Competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of required knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to follow relevant regulatory or Australian Standards requirements
The following resources should be made available:
workplace location or simulated workplace
materials and equipment relevant to undertaking work applicable to this unit
specifications and work instructions
Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of the FPI11 Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of required knowledge
Assessment must be by direct observation of tasks, with questioning on required knowledge and it must also reinforce the integration of employability skills
Assessment methods must confirm the ability to access and correctly interpret and apply the required knowledge
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency
The assessment environment should not disadvantage the candidate
Assessment practices should take into account any relevant language or cultural issues related to Aboriginality, gender or language backgrounds other than English
Where the participant has a disability, reasonable adjustment may be applied during assessment
Language and literacy demands of the assessment task should not be higher than those of the work role
Replaced By
State Code National Code Title Type
AXJ75 FWPSAW4204 Plan and monitor board conversion Unit of competency
State Code National Code Title Type
J478 FPI50111 Diploma of Forest and Forest Products Qualification
J475 FPI40211 Certificate IV in Timber Processing Qualification