Unit of competency Outline

Date retreived
22/07/2026 3:01 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Solve problems in complex multiple path circuits

Solve problems in complex multiple path circuits

Unit of competency
National Code
UEENEEE025B
State Code
W7827
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
29/07/2011
State Implementation and Classification
Approved Date
10/12/2010
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
10/12/2010
Nominal Hours
54
Description
1)1.1) DescriptorThis unit covers determining correct operation of complex series-parallel circuits and providing solutions as they apply to various electrotechnology work functions. It encompasses working safely, problem solving procedures, including using electrical measuring devices, applying appropriate circuit theorems and providing solutions derived from measurements and calculations and justification for such solutions.
Notes
Elements and Performance Criteria
1 Prepare to solve problems in complex multiple path circuits.
  • 1.1 OHS procedures for a given work area are identified, obtained and understood.
  • 1.2 OHS risk control work preparation measures and procedures are followed.
  • 1.3 The nature of the circuit(s) problem is obtained from documentation or from work supervisor to establish the scope of work to be undertaken.
  • 1.4 Advice is sought from the work supervisor to ensure the work is coordinated effectively with others.
  • 1.5 Sources of materials that may be required for the work are identified and accessed in accordance with established procedures.
  • 1.6 Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety.
2 Solve problems in complex multiple path circuits
  • 2.1 OHS risk control work measures and procedures are followed.
  • 2.2 The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures.
  • 2.3 Circuits are checked as being isolated where necessary in strict accordance OHS requirements and procedures.
  • 2.4 Established methods are used to solve circuit problems from measure and calculated values as they apply to complex multiple path circuit.
  • 2.5 Unexpected situations are dealt with safely and with the approval of an authorised person.
  • 2.6 Problems are solved without damage to apparatus, circuits, the surrounding environment or services and using sustainable energy practices.
3 Complete work and document problem solving activities.
  • 3.1 OHS work completion risk control measures and procedures are followed.
  • 3.2 Work site is cleaned and made safe in accordance with established procedures.
  • 3.3 Justification for solutions used to solve circuit problems is documented.
  • 3.4 Work completion is documented and appropriate person(s) notified in accordance with established procedures.
No information
No information
Replaced By
State Code National Code Title Type
S7312 UEENEEE125A Provide engineering solutions for problems in complex multiple path circuits Unit of competency