Unit of competency Outline
Date retreived
22/07/2026 10:23 PM AWST
22/07/2026 10:23 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Design wind energy conversion systems (WECS) rated to 10 kW
Design wind energy conversion systems (WECS) rated to 10 kW
Unit of competency
National Code
UEERE0032
UEERE0032
State Code
OBY61
OBY61
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Original Release Date
12/07/2021
Nominal Hours
54
Description
This unit involves the skills and knowledge required to design wind energy conversion system (WECS) rated to 10 kilowatt (kW) and its installation.It includes determining and developing WECS design, following design briefs, documenting design calculations and criteria, and obtaining design approval for WECS.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to design WECS
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) processes and workplace procedures for a given work area are identified, obtained and applied
- 1.2 Scope of the WECS is determined from design brief
- 1.3 Safety and regulatory requirements to which the electrical installation must comply are identified, obtained and applied
- 1.4 Design development work is planned to meet scheduled timelines in consultation with relevant person/s involved in the WECS installation or associated work
2 Develop WECS design
- 2.1 WECS performance standards and compliance methods are applied to the design
- 2.2 Alternative WECS designs are considered in accordance with the design brief
- 2.3 Safety, functionality and budgetary considerations are incorporated in the WECS design
- 2.4 WECS design is drafted and checked for compliance with the design brief and regulatory requirements
- 2.5 WECS design is documented for submission to relevant person/s for acceptance and approval
- 2.6 Unplanned situations are dealt with safely and effectively in accordance with workplace procedures
3 Obtain design approval for WECS
- 3.1 WECS design is presented and any issues clarified with client representative and/or relevant person/s
- 3.2 Requests for alterations to the design are negotiated with relevant person/s within the constraints of workplace policies
- 3.3 Final design is documented and approval obtained from relevant person/s
- 3.4 Quality of work is monitored in accordance with relevant performance agreement and/or workplace procedures or industry standards
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC701 | UEENEEK131A | Design wind energy conversion systems (WECS) rated to 10 kW | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OEV88 | UEERE0065 | Design wind energy systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFK5 | UEE50420 | Diploma of Electrical Engineering | Qualification |
| BFK9 | UEE63020 | Advanced Diploma of Electrical Systems Engineering | Qualification |
| BFN8 | UEE62120 | Advanced Diploma of Engineering Technology - Electrical | Qualification |
| BHZ3 | UEE62122 | Advanced Diploma of Engineering Technology - Electrical | Qualification |
| BFM3 | UEE62020 | Advanced Diploma of Engineering Technology - Renewable Energy | Qualification |
| BFK4 | UEE50720 | Diploma of Renewable Energy Engineering | Qualification |
| BFJ7 | UEE60920 | Advanced Diploma of Renewable Energy Engineering | Qualification |