Unit of competency Outline

Date retreived
22/07/2026 4:01 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Operate complex glass processing plant control systems

Operate complex glass processing plant control systems

Unit of competency
National Code
MSFGG4006
State Code
WI509
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
10/12/2013
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
20/06/2014
Nominal Hours
70
Description
This unit of competency covers operating a complex glass processing plant control panel utilising control loops and a broad range of control algorithms to control plant areas and multiple products/process streams. It will typically be located in a control room and require managing multiple complex tasks.The technician/central control room operator takes overall responsibility for the operation of all equipment and processes within the plant area and may include optimisation of the area using the control system. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Use operator interface
  • 1.1 Keyboards, track ball and monitor and/or stand-alone controllers are used to access control system/panel
  • 1.2 Glass processing task is monitored using the operator interfaces selecting appropriate controller modes
  • 1.3 Historical data and information are accessed as required
  • 1.4 Messages and alarms are monitored and acknowledged with appropriate action taken
  • 1.5 Advanced control features are accessed and managed as appropriate
2 Access control information
  • 2.1 Relevant data and information are accessed from the control system by applying systems knowledge
  • 2.2 Status of individual pieces of equipment is determine from the control panel readings and the information used to identify potential faults
  • 2.3 Fluctuations and variations in process through the interpretation of existing trends and control schematics are minimised
  • 2.4 Overall operating effectiveness of the plant area is determine and related to the required targets for the area
  • 2.5 Process variations/irregularities to procedures are recoded as necessary
3 Control process variations and monitor operations
  • 3.1 Historical data on plant operations are used to assist the identification of problems and all available information processed to identify potential faults
  • 3.2 Required set point/output changes are undertaken to meet plant area and process requirements
  • 3.3 Production is adjusted in response to test results and control panel information
  • 3.4 Key process and environmental variables are monitored and appropriate action taken
  • 3.5 Controller settings are adjusted in accordance with procedures with advanced control features utilised as appropriate
  • 3.6 Plant area is optimised in accordance with guidelines
  • 3.7 Calibration operations are made as appropriate
  • 3.8 Coordination with stakeholders external to the plant area is undertaken as required
  • 3.9 Adjustments and variations to specifications/schedules are recorded and communicated to appropriate personnel
4 Facilitate planned and unplanned process start-ups and shutdowns
  • 4.1 Procedures to planned startup and shutdown processes are selected and applied
  • 4.2 Procedures to unplanned shutdown processes are selected and applied where required
  • 4.3 Required emergency responses are implemented
  • 4.4 Necessary information is communicated to all personnel affected by events
  • 4.5 Required information is logged regularly
5 Respond to alarms or out of specification conditions and control hazards
  • 5.1 System(s) affected by the alarm or condition are identified, prioritised and appropriate action taken
  • 5.2 Alarm or incidents are responded to promptly by following procedures
  • 5.3 Any out of specification material is dealt with in accordance with procedures and the problem/solution communicated to appropriate personnel
  • 5.4 Incident information is recorded as required and details of the alarm and action taken communicated to the next shift at change over
  • 5.5 Incidents are followed up to confirm that appropriate action has been taken
  • 5.6 Hazards in the production/processing work area are identified and the risks arising from those hazards assessed
  • 5.7 Measures to control risks are implemented in line with procedures and duty of care
6 Resolve other problems within scope of responsibility
  • 6.1 Possible problems in equipment, control systems or process are identified to determine problems needing action
  • 6.2 Possible fault causes are established and problems rectified using appropriate solution within area of responsibility
  • 6.3 Initiated control actions are followed through until final resolution has occurred with problems outside area of responsibility reported to designated person
No information
No information
Replaced By
State Code National Code Title Type
OAI96 MSFGG4014 Operate complex glass processing plant control systems Unit of competency
State Code National Code Title Type
J750 MSF40413 Certificate IV in Glass and Glazing Qualification