Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install interior blinds
Install interior blinds
Unit of competency
National Code
MSFBA3001
MSFBA3001
State Code
WI262
WI262
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
030199 - Manufacturing Engineering And Technology, N.e.c.
Original Release Date
19/06/2014
Nominal Hours
30
Description
This unit of competency covers installation of interior blinds. It applies in an on-site residential or commercial environment.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Identify products, fittings and attachments to be used
- 1.1 Type of blind to be fitted and work order requirements are identified
- 1.2 Type of installation and access to site where restrictions on access may determine equipment used are identified from work order or site inspection
- 1.3 Mounting brackets, materials and tools are identified from work instructions and site inspection conducted in consultation with customer
2 Plan process for installing blinds
- 2.1 Customer is consulted to determine suitable day and time for installation
- 2.2 Equipment is identified to minimise risk of damage to customer’s premises or injuries to self
- 2.3 Work sequence is planned in a logical order
- 2.4 Attachment process is planned to conform to quality requirements, maximise the appearance of the finished work and provide for the most economical use of materials and labour
- 2.5 Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
- 2.6 Blind operating mechanism is set up and checked against manufacturer specifications and work instructions
3 Complete installation
- 3.1 Work health and safety (WHS) requirements, including personal protection needs, are observed throughout the work
- 3.2 Blinds are fitted and tested within limitations of normal operation for correct operation
- 3.3 Pelmets, cord brackets and pulleys are fitted using appropriate hardware and adjusted to suit blind operation
- 3.4 Blind is checked for correct operation and adjusted or repaired if necessary
- 3.5 Customer is advised on correct operation of blind
4 Complete job and clean work area
- 4.1 Worksite is cleaned and equipment is cleaned and stored according to workplace practices
- 4.2 Rubbish is cleared and waste collected for disposal in accordance with workplace practices and environmental legislation covering disposal of industrial waste or recycling, as appropriate, in accordance with workplace practices
5 Settle payment
- 5.1 Customer is presented with invoice, payment collected and receipt issued
- 5.2 Workplace documentation is completed and filed according to workplace procedures
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OBP07 | MSFBA3017 | Install interior blinds | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J737 | MSF30913 | Certificate III in Blinds, Awnings, Security Screens and Grilles | Qualification |