Unit of competency Outline
Date retreived
22/07/2026 1:32 AM AWST
22/07/2026 1:32 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Coordinate Power Generation
Coordinate Power Generation
Unit of competency
National Code
UEPOPS515A
UEPOPS515A
State Code
S5299
S5299
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
22/06/2011
Field of Education
031301 - Electrical Engineering
Original Release Date
22/06/2011
Nominal Hours
60
Description
1)
This unit deals with the skills and knowledge required to coordinate operation and control of multiple generators sharing load under the control of one operator in an isolated system.
This unit deals with the skills and knowledge required to coordinate operation and control of multiple generators sharing load under the control of one operator in an isolated system.
Notes
Elements and Performance Criteria
1 Plan for plant operation
- 1.1 Safety issues are identified to comply with enterprise/site requirements
- 1.2 Work, plant and resource requirements are identified from relevant information and documentation
- 1.3 Pre operational checks are carried out in accordance with enterprise and site requirements
- 1.4 Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training
2 Operate generator and excitation system
- 2.1 System is operated in accordance with enterprise/site and manufacturer's operating procedures
- 2.2 Synchronising requirements are assessed, evaluated and achieved to ensure machine/system stability during synchronising
- 2.3 System is monitored and observed to detect deviations from normal operating conditions
- 2.4 Corrective actions are taken to rectify abnormalities in accordance with manufacturer's and enterprise/site procedures
3 Control generation of electrical energy
- 3.1 Generator output is adjusted to meet demand whilst observing operating requirements
- 3.2 Reactive power generation and voltage regulation requirements are assessed and the system is controlled to achieve the desired output
- 3.3 Generator stabilities and operating limits are assessed and the system is controlled to maintain those limits tin accordance with enterprise/site and manufacturer's procedures
- 3.4 Generator cooling systems and limits are monitored and assessed and excitation system is controlled to maintain those limits in accordance with enterprise/site and manufacturer's procedures
4 Coordinate generation control
- 4.1 Load sharing between multiple generators is controlled to maintain optimum efficiency and plant reliability
- 4.2 Output of generators is adjusted to meet demand whilst observing operating requirements
- 4.3 System/plant key indicators are monitored and adjusted to maintain within limits and detect deviations from normal operating conditions
- 4.4 Corrective actions taken to rectify system abnormalities are in accordance with manufacturer's, enterprise/site requirements
- 4.5 System integrity, personal safety and continuity of supply are maintained throughout.
- 4.6 Consultation with appropriate personnel is undertaken as required in accordance with enterprise/ site requirements.
- 4.7 Systems are operated at optimum efficiency
5 Monitor system/plant
- 5.1 System/plant to be monitored is physically identified
- 5.2 System/plant is monitored for normal operation or to detect deviations
- 5.3 Corrective action taken is in accordance with enterprise/site procedures
- 5.4 Appropriate personnel are notified when defects and abnormal operating conditions are detected
6 Analyse system/plant faults
- 6.1 Causes of abnormal system operating conditions are identified by analysing the technical and operational information in a logical and sequential manner
- 6.2 Actions necessary to rectify fault are correctly determined
- 6.3 System/plant integrity and personnel safety are maintained through consultation with appropriate personnel, and reference to plant, technical and operational documentation
- 6.4 Appropriate personnel are arranged for local investigation of identified operational abnormalities
7 Complete documentation
- 7.1 Documentation is updated and plant problems, movements, abnormalities and status are reported and logged in accordance with enterprise/site procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AYG19 | UTPNEG285A | Co-ordinate power generation | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE445 | UEPOPS515B | Coordinate power generation | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| S508 | UEP50106 | Diploma of ESI Generation (Systems Operations) | Qualification |