Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Compile mine survey plan
Compile mine survey plan
Unit of competency
National Code
CPPSIS6041A
CPPSIS6041A
State Code
WE840
WE840
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
25/10/2013
Field of Education
031101 - Surveying
Original Release Date
25/10/2013
Nominal Hours
60
Description
This unit of competency specifies the outcomes required to compile mine survey plans to meet legislative requirements.
Notes
Elements and Performance Criteria
1 Determine project deliverables.
- 1.1 Organisational priorities are determined to identify project activity.
- 1.2 Design information is accessed and interpreted to identify the spatial data requirements and the components to be measured and monitored.
- 1.3 Project specifications are presented to relevant personnel.
- 1.4 Agreed communication processes between project members, client and other stakeholders are implemented and maintained.
2 Organise processes to compile mine survey plans.
- 2.1 Surveying requirements essential for compiling mine survey plans are checked for currency and validity.
- 2.2 Survey database, file structures and conventions, and metadata are created.
- 2.3 Project management mechanisms are implemented to measure, record and report progress of planned activities in relation to the agreed schedule and plans.
- 2.4 Quality assurance processes are implemented based on the project plan.
3 Standardise plot requirements
- 3.1 Requirements for plan lodgement are identified.
- 3.2 OHS and legislative requirements are incorporated into project risk management.
- 3.3 Requirements of legislative framework are identified and incorporated into project risk management.
- 3.4 Standard mine plan drawing requirements are researched.
- 3.5 Mine plans are developed according to legislation, organisation and project plotting specifications.
- 3.6 Contingencies and constraints are managed to ensure project meets specifications.
4 Produce mine plans.
- 4.1 Measured spatial data is reduced to project reference system.
- 4.2 Mine drawings are created to meet legislative and statutory project plotting specifications.
- 4.3 Measurements are validated and recorded according to project specifications.
5 Finalise the project.
- 5.1 Relevant personnel are informed of the results according to organisational guidelines.
- 5.2 Required documentation is completed according to organisational guidelines.
- 5.3 Spatial data is archived according to project specifications.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the performance criteria is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Organisational priorities may include:
client focus
external influence and focus
financial priorities
internal influence and focus
operational plan
strategic plan.
Spatial data requirements may include:
reduction
manipulation.
Project specifications may include:
detailed technical descriptions of survey data and its requirements
preparation of cross-sections and plans, with all information included.
Relevant personnel may include:
colleagues
company personnel
staff or employee representatives
supervisors or line managers
suppliers.
Client may include:
customers with routine or special requests
external to organisation
internal to organisation
regular and new customers, including:
business enterprises
government agencies
members of the public
suppliers.
Stakeholders may include:
human resource personnel: internal or external
procurement agency: internal or external management.
Surveying requirements must include:
mine grid coordinate systems
personnel practices and guidelines outlining teamwork, work roles and responsibilities
requirements for data processing
surface and underground baselines.
Project management mechanisms may include:
communication with stakeholders
dispute resolution guidelines
monitoring and adjusting key milestones.
Quality assurance processes may include:
internal and external
monitoring activity against set targets
product or service measurement against set criteria
standard verification.
Risk management may include:
adhering to budget
anticipating external influences
contingency planning
guidelines for the selection of contractors
effective communication and consultation
effective project management
internal and external audit processes
milestone review and evaluation
realistic timelines
targeted activity.
Mine plan drawing requirements may include:
map legends
plot symbols.
Mine plans may include:
accident plans
emergency plans
open cut mine plans
surface infrastructure plans
underground level plans
ventilation plans.
Legislation, organisation and project plotting specifications may include:
endorsements
grid convergence
legends
long and cross-section plot requirements
OHS
quality assurance requirements
sheet surround.
Contingencies may include:
equipment failure
injury to personnel
personnel turnover.
Measurements may include:
use of:
global navigation satellite system (GNSS)
gyro-theodolite
laser technologies
level
remote sensing
tape
total station.
Required documentation may include:
electronic or paper-based correspondence with client
field records
final report
records of conversation
survey plots
organisational work activity sheets.
Organisational priorities may include:
client focus
external influence and focus
financial priorities
internal influence and focus
operational plan
strategic plan.
Spatial data requirements may include:
reduction
manipulation.
Project specifications may include:
detailed technical descriptions of survey data and its requirements
preparation of cross-sections and plans, with all information included.
Relevant personnel may include:
colleagues
company personnel
staff or employee representatives
supervisors or line managers
suppliers.
Client may include:
customers with routine or special requests
external to organisation
internal to organisation
regular and new customers, including:
business enterprises
government agencies
members of the public
suppliers.
Stakeholders may include:
human resource personnel: internal or external
procurement agency: internal or external management.
Surveying requirements must include:
mine grid coordinate systems
personnel practices and guidelines outlining teamwork, work roles and responsibilities
requirements for data processing
surface and underground baselines.
Project management mechanisms may include:
communication with stakeholders
dispute resolution guidelines
monitoring and adjusting key milestones.
Quality assurance processes may include:
internal and external
monitoring activity against set targets
product or service measurement against set criteria
standard verification.
Risk management may include:
adhering to budget
anticipating external influences
contingency planning
guidelines for the selection of contractors
effective communication and consultation
effective project management
internal and external audit processes
milestone review and evaluation
realistic timelines
targeted activity.
Mine plan drawing requirements may include:
map legends
plot symbols.
Mine plans may include:
accident plans
emergency plans
open cut mine plans
surface infrastructure plans
underground level plans
ventilation plans.
Legislation, organisation and project plotting specifications may include:
endorsements
grid convergence
legends
long and cross-section plot requirements
OHS
quality assurance requirements
sheet surround.
Contingencies may include:
equipment failure
injury to personnel
personnel turnover.
Measurements may include:
use of:
global navigation satellite system (GNSS)
gyro-theodolite
laser technologies
level
remote sensing
tape
total station.
Required documentation may include:
electronic or paper-based correspondence with client
field records
final report
records of conversation
survey plots
organisational work activity sheets.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the Assessment Guidelines for this Training Package.
Overview of assessment
This unit of competency could be assessed on its own or in combination with other units relevant to the job function, for example CPPSIS6021A Conduct open mine pit surveying and CPPSIS6033A Conduct underground mine surveying.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
conducting an accurate collection and validation process based on thorough assessment of all relevant considerations
matching objectives with resources to ensure project proceeds in an organised and timely manner
recording and reporting non-conformity aspects
displaying knowledge of underground mining operations
taking responsibility for team outputs in work and learning.
Specific resources for assessment
Resource implications for assessment include access to:
assessment instruments, including personal planner and assessment record book
assignment instructions, work plans and schedules, policy documents and duty statements
registered training provider of assessment services
relevant guidelines, regulations and codes of practice
suitable venue and equipment.
Access must be provided to appropriate learning and assessment support when required.
Where applicable, physical resources should include equipment modified for people with disabilities.
Context of assessment
Holistic: based on the performance criteria, evidence guide, range statement, and required skills and knowledge.
Method of assessment
Demonstrated over a period of time and observed by the assessor (or assessment team working together to conduct the assessment).
Demonstrated competency in a range of situations, which may include customer/workplace interruptions and involvement in related activities normally experienced in the workplace.
Obtained by observing activities in the field and reviewing induction information. If this is not practicable, observation in realistic simulated environments may be substituted.
Guidance information for assessment
Assessment requires that the clients’ objectives and industry expectations are met. If the clients’ objectives are narrowly defined or not representative of industry needs, it may be necessary to refer to portfolio case studies of a variety of SIS requirements to assess competency.
Oral questioning or written assessment and hypothetical situations (scenarios) may be used to assess underpinning knowledge (in assessment situations where the candidate is offered a preference between oral questioning or written assessment, questions are to be identical).
Supplementary evidence may be obtained from relevant authenticated correspondence from existing supervisors, team leaders or specialist training staff.
All practical demonstration must adhere to the safety and environmental regulations relevant to each State or Territory.
Overview of assessment
This unit of competency could be assessed on its own or in combination with other units relevant to the job function, for example CPPSIS6021A Conduct open mine pit surveying and CPPSIS6033A Conduct underground mine surveying.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
conducting an accurate collection and validation process based on thorough assessment of all relevant considerations
matching objectives with resources to ensure project proceeds in an organised and timely manner
recording and reporting non-conformity aspects
displaying knowledge of underground mining operations
taking responsibility for team outputs in work and learning.
Specific resources for assessment
Resource implications for assessment include access to:
assessment instruments, including personal planner and assessment record book
assignment instructions, work plans and schedules, policy documents and duty statements
registered training provider of assessment services
relevant guidelines, regulations and codes of practice
suitable venue and equipment.
Access must be provided to appropriate learning and assessment support when required.
Where applicable, physical resources should include equipment modified for people with disabilities.
Context of assessment
Holistic: based on the performance criteria, evidence guide, range statement, and required skills and knowledge.
Method of assessment
Demonstrated over a period of time and observed by the assessor (or assessment team working together to conduct the assessment).
Demonstrated competency in a range of situations, which may include customer/workplace interruptions and involvement in related activities normally experienced in the workplace.
Obtained by observing activities in the field and reviewing induction information. If this is not practicable, observation in realistic simulated environments may be substituted.
Guidance information for assessment
Assessment requires that the clients’ objectives and industry expectations are met. If the clients’ objectives are narrowly defined or not representative of industry needs, it may be necessary to refer to portfolio case studies of a variety of SIS requirements to assess competency.
Oral questioning or written assessment and hypothetical situations (scenarios) may be used to assess underpinning knowledge (in assessment situations where the candidate is offered a preference between oral questioning or written assessment, questions are to be identical).
Supplementary evidence may be obtained from relevant authenticated correspondence from existing supervisors, team leaders or specialist training staff.
All practical demonstration must adhere to the safety and environmental regulations relevant to each State or Territory.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AXG02 | CPPSIS6041 | Compile mine survey plans | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J360 | CPP60312 | Advanced Diploma of Surveying | Qualification |