Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Establish monitoring sites
Establish monitoring sites
Unit of competency
National Code
NWPHYD012
NWPHYD012
State Code
AVZ18
AVZ18
TGA Status
Deleted
Deleted
DTWD Status
Transition (Deleted)
Transition (Deleted)
State Implementation and Classification
Approved Date
15/04/2016
Field of Education
010711 - Hydrology
Original Release Date
15/04/2016
Nominal Hours
100
Description
This unit of competency describes the skills required to establish monitoring sites to organisational standards. The ability to interpret and apply technical specifications and to establish sites to support the collection of data is central to successful performance. This unit applies to hydrographers employed by the water industry and to water operators involved in the monitoring of all the elements of the water cycle and their impact on the related environment.The skills and knowledge described in this unit must be applied within the legislative, regulatory and policy environment in which they are carried out. Organisational policies and procedures must be consulted and adhered to, particularly those relating to WHS, Bureau of Meteorology, World Meteorological Organisation and Australian Standards.Those undertaking this unit would work in small teams, mostly under supervision, while performing complex tasks in a broad range of contexts, that could be unpredictable, including remote, confined spaces, near water and/or at heights.No licensing, legislative or certification requirements apply to unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan the establishment of monitoring sites and facilities
- 1.1 Identify monitoring requirements based on business objectives of the site or facility.
- 1.2 Identify and confirm the establishment requirements and standard procedures for the site or facility.
- 1.3 Consult with stakeholders.
- 1.4 Conduct site investigations and surveys to select sites and equipment fit for purpose.
- 1.5 Prepare project and risk management plans and designs for the establishment of the site or facility and secure authorisation.
2. Establish the site and facilities
- 2.1 Conduct a site specific risk assessment.
- 2.2 Identify, assemble and check the equipment required for the task prior to use.
- 2.3 Establish the site or facility according to the project plan.
- 2.4 Establish and register sites and ancillary infrastructure.
- 2.5 Complete records of the establishment process.
3. Support data collection
- 3.1 Determine and apply instrument and site maintenance schedules.
- 3.2 Determine and apply testing schedules.
- 3.3 Put in place processes to monitor instrument performance and take corrective action as required.
- 3.4 Maintain test records.
- 3.5 Compile and store reports and documentation.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D1920 | NWP342A | Commission, decommission and monitor hydrometric sites, stations and facilities | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AYW7 | NWP30215 | Certificate III in Water Industry Operations | Qualification |