Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install engineered timber flooring

Install engineered timber flooring

Unit of competency
National Code
MSFFL2024
State Code
WI354
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
10/12/2013
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
040321 - Floor Coverings
Original Release Date
19/06/2014
Nominal Hours
35
Description
This unit of competency covers floating or installing stick by stick an engineered timber floor within a space over a soft underlay, including preparation, cutting, laying and fixing. It applies to a variety of flooring technology installation operations in an on-site environment and involves application of skills and knowledge at the sub-trade worker level. Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Prepare materials for installation
  • 1.1 Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing engineered timber flooring are verified and complied with
  • 1.2 WHS requirements, including personal protection needs, are observed throughout the work
  • 1.3 Instructions and/or plans are read and interpreted to identify process required to complete work tasks
  • 1.4 Sub-floor condition is assessed for suitability for installation of engineered timber flooring
  • 1.5 Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  • 1.6 Sequence of work is planned, including the selection of a starting point, to ensure efficiency and quality of installation
2 Set out materials for installation
  • 2.1 Engineered timber flooring is acclimatised according to manufacturer recommendations
  • 2.2 Engineered timber flooring for fixing is organised and used in accordance with relevant safety management requirements
  • 2.3 Skirting boards or cover trims are removed or undercut, if required, and stored for re-fitting or sent for machining
  • 2.4 Adhesives and edge strips are prepared for use as required
3 Lay out flooring
  • 3.1 Instructions and sequence for laying and fixing are followed
  • 3.2 Engineered timber flooring is laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins
  • 3.3 The aesthetics of the materials are maximised, including matching grains and colours
  • 3.4 Engineered timber flooring materials are accurately and clearly marked for cutting
  • 3.5 Materials are cut to length and size for final laying ensuring minimum waste
4 Lay flooring
  • 4.1 Materials for fixing are organised and used in accordance with relevant safety management requirements
  • 4.2 Adhesives and edge strips/accessories are prepared for use as required
  • 4.3 Fixing methods and equipment are used following manufacturer recommendations
  • 4.4 Appropriate field and perimeter expansion joints are allowed
  • 4.5 Skirting boards or cover trims are fitted/re-fitted and finished
  • 4.6 Finished job is inspected and any imperfections are rectified following workplace procedures
  • 4.7 Any required preparations for sanding of flooring are made
5 Complete housekeeping
  • 5.1 Unused materials are stored or recycled as required
  • 5.2 Tools and equipment are cleaned and stored appropriately
  • 5.3 Work area is cleaned and rubbish is disposed of appropriately
  • 5.4 Workplace documentation is completed
No information
No information
Replaced By
State Code National Code Title Type
OAJ83 MSFFL2040 Install engineered timber flooring Unit of competency
State Code National Code Title Type
J736 MSF30813 Certificate III in Flooring Technology Qualification