Unit of competency Outline
Date retreived
22/07/2026 7:05 AM AWST
22/07/2026 7:05 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Coordinate and monitor bulkwater system operations
Coordinate and monitor bulkwater system operations
Unit of competency
National Code
NWPCAD021
NWPCAD021
State Code
OCW31
OCW31
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
12/04/2021
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
12/04/2021
Nominal Hours
40
Description
This unit involves the skills and knowledge required to coordinate and monitor bulkwater system operations.It includes monitoring and coordinating the operation of bulkwater systems, measuring and reporting on system performance and process quality control.This unit applies to workers responsible for ensuring that bulkwater system operations are coordinated and monitored to ensure compliance with organisational and statutory requirements. Those undertaking this unit would work autonomously, usually with supervisory responsibilities, while performing complex tasks in a range of contexts.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Confirm performance measures
- 1.1 Identify water flow, quality and quantity requirements
- 1.2 Identify surveillance and stakeholder requirements
- 1.3 Identify operational performance measures
- 1.4 Identify environmental factors impacting on water flows and quality
2 Monitor and coordinate asset performance
- 2.1 Identify hazards, assess risks and implement control measures according to workplace procedures
- 2.2 Select, fit and use equipment, including personal protective equipment
- 2.3 Apply monitoring and testing programs according to workplace procedures
- 2.4 Monitor assets to ensure performance meets specifications in management plan
- 2.5 Develop and schedule maintenance programs
- 2.6 Monitor water flows and quality according to stakeholder needs
- 2.7 Coordinate processes to meet plan requirements and targets
- 2.8 Optimise system performance according to workplace procedures
3 Finalise work
- 3.1 Analyse, record and report coordination and monitoring data to relevant stakeholders
- 3.2 Identify and report current and potential problems
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AVY37 | NWPSOU041 | Coordinate and monitor bulkwater system operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AE454 | NWPSS00011 | Dam Operations and Maintenance Skill Set | Skill set |
| BGJ9 | NWP40120 | Certificate IV in Water Industry Operations | Qualification |