Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Supervise on-site implementation of conservation earthworks
Supervise on-site implementation of conservation earthworks
Unit of competency
National Code
AHCSAW402A
AHCSAW402A
State Code
D7238
D7238
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
13/10/2014
Field of Education
040399 - Building, N.e.c.
Original Release Date
13/10/2014
Nominal Hours
50
Description
This unit covers supervising on-site implementation of conservation earthworks and defines the standard required to: implement measures that will achieve the optimum efficiency of the earthmoving operation; put into practice measures that construct structurally sound earthworks; control construction to achieve specifications; instigate measures that finish earthworks to specifications.
Notes
Elements and Performance Criteria
1. Plan efficient implementation of works
- 1.1. Plans and specifications are reviewed and related to the works site.
- 1.2. Economics of operation are maximised through the deployment of trained personnel and equipment selection.
- 1.3. Work sequences are planned and recorded in line with proposed work schedule.
- 1.4. Materials are ordered to complete proposed works in line with construction schedule.
- 1.5. Compliance with established regulatory planning and environmental legislation is maintained.
2. Direct implementation of planned works
- 2.1. Equipment and personnel deployment ensures structurally sound works in line with earthworks planned.
- 2.2. Job specifications and regulatory requirements are achieved in accordance with the plan or necessary modification.
- 2.3. Modified techniques are adopted to minimise the effect of site limitation in achieving job requirements.
- 2.4. Safe machine operations are monitored to ensure they meet relevant Occupational Health and Safety (OHS) requirements.
3. Monitor job specification
- 3.1. Progressive job checking results in achieving job specifications, contracts and targets.
- 3.2. Instructions to plant operators ensure high finishing standards to earthworks.
- 3.3. Modifications are made to job specifications in consultation with the landholder or works supervisor.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole.
Types of project may include:
earthworks required as part of erosion control projects
farm dam construction
access track construction.
The range statement relates to the unit of competency as a whole.
Types of project may include:
earthworks required as part of erosion control projects
farm dam construction
access track construction.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
implement measures that will achieve the optimum efficiency of the earthmoving operation.
put into practice measures that construct structurally sound earthworks.
control construction to achieve specifications
instigate measures that finish earthworks to specifications.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
implement measures that will achieve the optimum efficiency of the earthmoving operation.
put into practice measures that construct structurally sound earthworks.
control construction to achieve specifications
instigate measures that finish earthworks to specifications.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S2641 | RTD4207A | Supervise on-site implementation of conservation earthworks | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAO05 | AHCSAW403 | Supervise implementation of conservation earthworks plans | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D508 | AHC40910 | Certificate IV in Conservation and Land Management | Qualification |
| D625 | SFI40311 | Certificate IV in Seafood Industry (Environmental Management) | Qualification |