Unit of competency Outline
Date retreived
22/07/2026 9:52 PM AWST
22/07/2026 9:52 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct concrete agitator truck operations
Conduct concrete agitator truck operations
Unit of competency
National Code
CPCCCO3034A
CPCCCO3034A
State Code
D7372
D7372
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
27/09/2011
Field of Education
030717 - Plant And Machine Operations
Original Release Date
27/09/2011
Nominal Hours
32
Description
This unit of competency specifies the outcomes required to conduct concrete agitator truck operations in support of construction projects.The unit covers planning and preparing for work, conducting operational checks, the safe and effective operation of the concrete agitator truck and associated equipment for a range of mandatory tasks, and the conduct of operator maintenance and work finalisation activities.
Notes
Elements and Performance Criteria
1. Plan and prepare.
- 1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
- 1.3. Signage and barricade requirements are identified and implemented.
- 1.4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- 1.5. Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- 1.7. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
2. Conduct machine pre-operational checks.
- 2.1. Pre-start, start up, park and shut-down procedures are carried out in accordance with manufacturer and site specific requirements.
- 2.2. Vehicle controls and functions, including steering, brakes and manoeuvrability, are checked for serviceability and any faults are rectified or reported.
- 2.3. Agitator controls and functions are checked for serviceability and any faults are rectified or reported.
3. Operate the agitator truck.
- 3.1. Site hazards associated with truck operations are identified and safe operating techniques are used to minimise risk.
- 3.2. Engine power is managed to ensure efficiency of concrete agitator truck movements and to minimise damage to the engine and gears.
- 3.3. Engine power is coordinated with gear selection ensuring smooth transition and operation within torque range.
- 3.4. Truck is operated to work instructions in accordance with company operating procedures.
- 3.5. Road and traffic conditions are constantly monitored taking into account road standards, traffic flow, distance and load, ensuring no injury to people or damage to property, equipment, loads and facilities.
- 3.6. Truck is brought to a halt smoothly, minimising the wear and tear on vehicle using the engine retarder, gears and brakes.
4. Load, transport and discharge concrete.
- 4.1. Concrete agitator truck is positioned at load and discharge points with a minimum of manoeuvres.
- 4.2. Concrete agitator truck is loaded to within authorised carrying capacity of concrete mixes to suit the site and task conditions.
- 4.3. Concrete agitator truck is moved from loading to discharge point safely and smoothly avoiding surge and sway.
- 4.4. Concrete is discharged in accordance with task specifications.
- 4.5. Discharge systems, including chutes and adaptors, are monitored and maintained throughout the operations.
5. Carry out driver maintenance.
- 5.1. Concrete agitator truck is safely parked, prepared for maintenance and shut down as per manufacturers' manual and organisational requirements.
- 5.2. Inspection and fault finding are conducted in accordance with manufacturer specifications and organisational requirements.
- 5.3. Defective parts are removed and replaced safely and effectively according to manufacturers' manual and organisational requirements.
- 5.4. Regular programmed maintenance tasks are carried out in accordance with manufacturer and organisational requirements.
6. Clean up.
- 6.1. Work area is cleared and materials disposed of, reused or recycled in accordance with project environmental management plan.
- 6.2. Vehicle, bowl, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to operation of concrete agitator trucks on construction sites
relevant Australian standards
safe work procedures relating to operation of concrete agitator trucks on construction sites
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances
hazards and risks including uneven/unstable terrain, trees, fires, overhead services, bridges, buildings, excavations, traffic, embankments, structures and hazardous materials
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
safe parking practices, including ensuring access ways are clear, equipment/ machinery is away from overhangs and refuelling sites, safe distance from excavations, and secured from unauthorised access or movement
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment include:
hand tools and maintenance equipment associated with the particular concrete agitator truck.
Quality requirements include:
internal company quality policy and standards
manufacturer specifications, where specified
relevant regulations, including Australian standards
workplace operations and procedures.
Environmental requirements include:
clean-up management
dust and noise
stormwater management
vibration
waste management.
Agitator controls:
are related to speed, revolutions, forward and return
may be air, mechanical or electrically actuated.
Discharge points:
include:
directly to site
into a wheelbarrow and hopper
may include into a kibble.
Concrete mixes:
may be relatively dry or increasingly wet
in order, from wet to dry
will include block-fill, pool mix, topping, slab, footing and kerb and guttering.
Discharging concrete means:
movement of concrete from the agitator truck by mechanical/gravity feed through chutes and adaptors of varying sizes.
Maintenance:
includes:
authorised servicing
cleaning
monitoring, recording and reporting faults
may include:
conducting authorised minor replacements
providing assistance to maintenance personnel during maintenance and repair activities.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to operation of concrete agitator trucks on construction sites
relevant Australian standards
safe work procedures relating to operation of concrete agitator trucks on construction sites
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances
hazards and risks including uneven/unstable terrain, trees, fires, overhead services, bridges, buildings, excavations, traffic, embankments, structures and hazardous materials
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
safe parking practices, including ensuring access ways are clear, equipment/ machinery is away from overhangs and refuelling sites, safe distance from excavations, and secured from unauthorised access or movement
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment include:
hand tools and maintenance equipment associated with the particular concrete agitator truck.
Quality requirements include:
internal company quality policy and standards
manufacturer specifications, where specified
relevant regulations, including Australian standards
workplace operations and procedures.
Environmental requirements include:
clean-up management
dust and noise
stormwater management
vibration
waste management.
Agitator controls:
are related to speed, revolutions, forward and return
may be air, mechanical or electrically actuated.
Discharge points:
include:
directly to site
into a wheelbarrow and hopper
may include into a kibble.
Concrete mixes:
may be relatively dry or increasingly wet
in order, from wet to dry
will include block-fill, pool mix, topping, slab, footing and kerb and guttering.
Discharging concrete means:
movement of concrete from the agitator truck by mechanical/gravity feed through chutes and adaptors of varying sizes.
Maintenance:
includes:
authorised servicing
cleaning
monitoring, recording and reporting faults
may include:
conducting authorised minor replacements
providing assistance to maintenance personnel during maintenance and repair activities.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures including quality requirements
communicate and work effectively and safely with others
conduct concrete agitator truck operations, to be performed over not less than three shifts and two different sites and are to include the tasks of:
positioning vehicle at the load point
loading and transporting concrete
discharging concrete at work site to specification
discharging directly to site
discharging to wheelbarrow and hopper
applying emergency procedures
conducting authorised operator maintenance.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures including quality requirements
communicate and work effectively and safely with others
conduct concrete agitator truck operations, to be performed over not less than three shifts and two different sites and are to include the tasks of:
positioning vehicle at the load point
loading and transporting concrete
discharging concrete at work site to specification
discharging directly to site
discharging to wheelbarrow and hopper
applying emergency procedures
conducting authorised operator maintenance.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9399 | CPCCCO3014A | Conduct concrete agitator truck operations | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WI739 | CPCCCO3054A | Operate concrete agitator trucks | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D392 | CPC30311 | Certificate III in Concreting | Qualification |
| W921 | TLI31210 | Certificate III in Driving Operations | Qualification |