Unit of competency Outline
Date retreived
22/07/2026 7:19 AM AWST
22/07/2026 7:19 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Plan and coordinate panel painting
Plan and coordinate panel painting
Unit of competency
National Code
FWPWPP3220
FWPWPP3220
State Code
AXJ21
AXJ21
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
05/10/2016
Field of Education
040325 - Painting, Decorating And Sign Writing
Original Release Date
05/10/2016
Nominal Hours
10
Description
This unit of competency describes the outcomes required to manage operational logistics for the roller coating, curtain coating and spray painting lines.The unit applies to production operators and technicians who plan and coordinate panel painting in a forest and wood products setting and also involves monitoring and evaluating processes and problems to determine improvements.No licensing, legislative, regulatory, or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan painting operations
- 1.1 Review and interpret work orders to determine production requirements.
- 1.2 Develop painting schedules and communicate to operators in line with organisational procedures.
- 1.3 Plan and schedule equipment settings and operations.
- 1.4 Plan and prescribe control measures to minimise waste of paint and additives.
- 1.5 Identify, monitor and assess variations in paint mixtures.
2. Coordinate painting operations
- 2.1 Direct operators to load and unload painting equipment.
- 2.2 Coordinate paint application and curing processes and monitor for quality finish and completion rates.
- 2.3 Check paint line performance and interpret data to ensure accuracy and intended coverage.
- 2.4 Modify schedules to ensure optimum and cost effective production outcomes and communicate changes to operators.
- 2.5 Coordinate the disposal of excess paint in line with environmental protection practices.
- 2.6 Direct correct processes for cleaning painting equipment to ensure compliance with organisational safety procedures and environmental protection practices.
- 2.7 Investigate, record and report major processing and equipment faults and resolve or report to appropriate personnel
3. Evaluate and modify painting processes.
- 3.1 Monitor and evaluate painting operations and output to determine process improvements.
- 3.2 Analyse systematic problems with plant, equipment, paints and panels for potential to improve painting processes.
- 3.3 Document recommended process improvements, communicate to appropriate personnel and seek approval.
- 3.4 Trial new processes, document outcomes and introduce appropriate system changes.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D6135 | FPIWPP3220B | Plan and coordinate panel painting | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAL3 | FWP30416 | Certificate III in Wood Panel Products | Qualification |