Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Carry out conite construction and wall sheet panelling
Carry out conite construction and wall sheet panelling
Unit of competency
National Code
CPCCSP3008
CPCCSP3008
State Code
OCM85
OCM85
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
01/06/2021
Nominal Hours
70
Description
This unit specifies the skills and knowledge required to carry out conite construction and wall sheet panelling. It includes preparing the surface by fixing building paper and securing lathing to wall framing.A person working at this level would be expected to take responsibility for organising and completing tasks assigned to them, without close supervision.Licensing, legislative or certification requirements may apply to this unit. Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of unit CPCWHS1001Prepare to work safely in the construction industry meets this requirement.
Notes
Elements and Performance Criteria
1 Plan and prepare to carry out conite construction and wall sheet panelling.
- 1.1 Read and interpret work instructions and plan sequence of work.
- 1.2 Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, and workplace requirements.
- 1.3 Select and use personal protective equipment (PPE) for each stage of the task.
- 1.4 Inspect work site, assess hazards and apply risk controls, including required signage and barricades.
- 1.5 Select tools and equipment, check for serviceability and report any faults.
- 1.6 Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
- 1.7 Erect and brace scaffolding to required height in accordance with licensing requirements.
2 Prepare surface.
- 2.1 Check metal or timber frame is solid and sturdy.
- 2.2 Fix building paper taut to face of frame in compliance with NCC.
- 2.3 Fit and fix expanded metal lathing (ELP).
- 2.4 Fix wall sheet panel to framing in compliance with NCC.
3 Apply conite finish.
- 3.1 Apply sand, cement and lime scratch coat.
- 3.2 Apply floating coat.
- 3.3 Screed and trowel to specified finish.
4 Clean up.
- 4.1 Clear work area, dispose of materials, and reuse or recycle in compliance with legislation, regulations and codes of practice.
- 4.2 Clean, check, maintain and store tools and equipment in accordance with manufacturers’ specifications.
No information
No information
No information