Unit of competency Outline
Information current as of
24/07/2026 3:38 PM AWST
24/07/2026 3:38 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Integrate multiple computer operating systems on a client server network
Integrate multiple computer operating systems on a client server network
Unit of competency
National Code
UEENEED024B
UEENEED024B
State Code
W7781
W7781
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
02/12/2008
Field of Education
031305 - Computer Engineering
Original Release Date
02/12/2008
Nominal Hours
72
Description
1)1.1) DescriptorThis competency standard unit covers interconnecting computers to form a local area network (LAN). It encompasses applying different computer and network operating systems on a single LAN, using network standards and protocols, selecting network topology and physical media, disaster planning recovery, performance management and documentation of work activities.Note: This unit applies to all aspects of Electrotechnology - engineering applications only. For general competencies related Information Technologies refer to the latest endorsed IT Training Package.
Notes
Elements and Performance Criteria
1 Prepare to install multiple operating systems on computers and a client server network.
- 1.1 OHS processes and procedures for a given work area are obtained and understood.
- 1.2 Established OHS risk control measures and procedures in preparation for the work are followed.
- 1.3 Operating systems, devices, software and services required are determined from network performance specifications and in consultations with persons of higher authority.
- 1.4 Network security policy is reviewed in network performance specifications and in consultation with person(s) of higher authority.
- 1.5 Activities are planned to meet scheduled timelines in consultation with others involved on the work.
- 1.6 Appropriate persons are consulted to ensure the work is co-ordinated effectively with others involved or affected by the work.
2 Install and configure computer and network operating systems.
- 2.1 OHS risk control measures and procedures for carrying out the work are followed.
- 2.2 Knowledge of computer and network operations and network infrastructure are applied to installing and configuring operating systems and software on computers and client server.
- 2.3 Network protocols are installed and configured to integrate computers using different operating systems in compliance with industry standards and variants as specified for the network.
- 2.4 Security measures of the network are implemented in compliance with security policy, industry standards and requirements specified for the network.
- 2.5 Disaster recovery plan is tested for absolute effectiveness and compliance with enterprise security policy.
- 2.6 Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes.
3 Monitor and optimise computer and network performance.
- 3.1 OHS risk control measures and procedures for carrying out the work are followed.
- 3.2 Network is monitored and common methods are implemented to optimise system performance.
- 3.3 Common computer and server malfunctions are identified and rectified using logical techniques and known solutions.
- 3.4 Computer and server operating system incremental updates and security patches are installed as soon as they are available.
- 3.5 Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes.
- 3.6 On-going checks of the quality of work outcomes are undertaken in accordance with job specification, technical standards, enterprise policy and/or regulatory requirements.
- 3.7 Work is carried out efficiently without unnecessary waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices.
4 Report integration and outcome of network monitoring activities.
- 4.1 Written justification is made for solutions used to rectify malfunctions and appropriate person/s notified in accordance with established procedures.
- 4.2 Computer and network installation and monitoring records are maintained in accordance with established procedures.
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC403 | UEENEED124A | Integrate multiple computer operating systems on a client server local area network | Unit of competency |