Unit of competency Outline

Date retreived
22/07/2026 2:14 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install basic metering equipment and flow control devices for irrigation systems

Install basic metering equipment and flow control devices for irrigation systems

Unit of competency
National Code
NWP216B
State Code
D1841
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
30/04/2012
State Implementation and Classification
Approved Date
10/02/2012
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
10/02/2012
Nominal Hours
30
Description
This unit of competency describes the outcomes required to install meters, flow control and regulating devices for irrigation systems. These installations may occur in ground and surface water source irrigation systems.
Notes
Elements and Performance Criteria
1 Plan and prepare work.
  • 1.1 Apply work requirements for installation of flow control and metering devices in irrigation systems from plans, specifications and instructions.
  • 1.2 Prepare work plans to ensure safety within the workplace.
  • 1.3 Select and check equipment and tools to meet safety requirements of the task and site.
  • 1.4 Select, fit and use personal protective equipment.
2 Install flow control devices in irrigation systems.
  • 2.1 Carry out installation of flow control devices in irrigation systems according to manufacturer guidelines and legislative and organisational requirements.
  • 2.2 Check that installed flow control devices meet specifications.
3 Install metering devices in irrigation systems.
  • 3.1 Carry out installation of flow metering devices in irrigation systems according to manufacturer guidelines and legislative and organisational requirements.
  • 3.2 Check that installed metering devices meet specifications.
4 Maintain flow control and metering devices in irrigation systems.
  • 4.1 Carry out routine inspections of flow control and metering facilities in irrigation systems according to organisational procedures.
  • 4.2 Carry out preventative maintenance and service of equipment and facilities according to manufacturer guidelines and organisational requirements.
5 Review, record and report activities.
  • 5.1 Check, maintain and store equipment, tools and materials according to manufacturer guidelines and organisational procedures.
  • 5.2 Restore work site to meet environmental and organisational requirements.
  • 5.3 Record and report activities according to organisational procedures.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Flow control and metering devices may include:
flow directional gates
regulators
pumping systems, including:
centrifugal
Archimedes screw type
submersible
positive displacement
valving systems, including:
sluice
gate
blade
non-return
doors, drop structures and bars
electronic monitoring and metering systems
mechanical flow usage meters
Dethridge-type wheels
Equipment and tools used may include:
hand and power tools
on- and off-road vehicles
lifting and winching equipment
mechanical excavation equipment
chemical spraying apparatus
small marine craft
personal protective equipment
Legislative and organisational requirements may include:
relevant federal and state or territory legislation and regulations
codes of practice, associated standards and guidance material
documented organisational policies, manuals and induction programs
relevant community planning and development agreements, such as land care agreements
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to install meters, flow control and regulating devices for irrigation systems:
planning and preparing the installation of flow control and metering devices
interpreting plans, specifications and instructions for installation of flow control devices
interpreting plans, specifications and instructions for installation of basic metering devices
conducting routine inspections, maintenance and servicing of basic metering, flow control and regulating devices
completing relevant workplace documentation
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence only taken at the point when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator and cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.
Replaces
State Code National Code Title Type
M1854 NWP216A Install basic metering equipment, flow control and regulating devices Unit of competency
Replaced By
State Code National Code Title Type
AVZ08 NWPIRR011 Install devices for irrigation systems Unit of competency
State Code National Code Title Type
D244 NWP20107 Certificate II in Water Operations Qualification