Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Operate steam boiler
Operate steam boiler
Unit of competency
National Code
FWPCOT3231
FWPCOT3231
State Code
AXL32
AXL32
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
05/10/2016
Field of Education
030717 - Plant And Machine Operations
Original Release Date
05/10/2016
Nominal Hours
32
Description
This unit of competency describes the outcomes required to start up, operate and store a steam-generating boiler. The unit applies to steam boiler operators in a timber processing plant setting and includes shutting down and cleaning equipment.Licensing, legislative, regulatory, or certification requirements apply to this unit in some states & territories at the time of publication and may differ according to jurisdiction.
Notes
Elements and Performance Criteria
1. Prepare for operation
- 1.1 Review operational order and where required check with appropriate personnel.
- 1.2 Select appropriate personal protective equipment and check for operational effectiveness.
- 1.3 Identify and set quantity of steam to be generated for allocated process.
- 1.4 Plan steam generation in line with work order.
2. Operate and monitor boiler
- 2.1 Use equipment in line with organisational safety procedures, manufacturer’s instructions and environmental protection practices.
- 2.2 Complete pre-operational safety and pre start-up checks to ensure operational effectiveness.
- 2.3 Start boiler and bring safely on line; communicate recent performance to appropriate personnel.
- 2.4 Assess continued operation of boiler against pre-operational checks, maintenance requirements and operating conditions.
- 2.5 Monitor boiler operation, diagnose status and adjust to maintain safe and efficient operation.
- 2.6 Store and record boiler house chemicals, in line with safety procedures and environmental protection practices.
- 2.7 Follow emergency shutdown procedures in cases of fire.
- 2.8 Complete operating log, record fuel efficiency and report to appropriate personnel.
3. Shut down and store boiler
- 3.1 Follow organisational safety procedures to shut down equipment.
- 3.2 Prepare boiler for inspection process; remove valves and fittings in line with organisational safety procedures.
- 3.3 Clean boiler externally and internally if appropriate in line with environmental protection practices.
- 3.4 Select storage mode and store boiler in line with organisational safety procedures.
- 3.5 Record and report and equipment faults and maintenance requirements to appropriate personnel.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D5940 | FPICOT3231B | Operate steam boiler | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OFD20 | FWPCOT3334 | Conduct steam boiler operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAM5 | FWP30316 | Certificate III in Sawmilling and Processing | Qualification |
| BAL3 | FWP30416 | Certificate III in Wood Panel Products | Qualification |