Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Operate and monitor HRSG hot gas control system
Operate and monitor HRSG hot gas control system
Unit of competency
National Code
UEPOPS101
UEPOPS101
State Code
ODX87
ODX87
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
14/04/2023
Field of Education
030717 - Plant And Machine Operations
Original Release Date
14/04/2023
Nominal Hours
36
Description
This unit involves the skills and knowledge required to operate, inspect and monitor heat recovery steam generator(HRSG) hot gas control systems.HRSGs are used to recover heat from hot gasstreams which is then supplied to a steam turbine to generate additional electric power. The hot gas control system is used to operate the internal gas returnand bypasssystem in the HRSG.Competency in this unit requires the ability to plan work, operate HRSG plant, test HRSG plant, analyse HRSG plant faults, monitor and inspect HRSG plant, and complete all documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator.Power generation plant operators are trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare work
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, environmental requirements and workplace procedures are identified, applied and monitored
- 1.2 Work requirements are identified from relevant personnel and documentation in accordance with workplace procedures
- 1.3 Documentation to determine HRSG hot gas control system plant status is assessed and evaluated in accordance with workplace procedures
- 1.4 Inspection and field preparation for HRSG hot gas control system plant service is carried out in accordance with manufacturers' recommendations and specifications, and workplace procedures
- 1.5 HRSG hot gas control system plant operational prerequisites are established in accordance with manufacturers' recommendations and specifications, and workplace procedures
- 1.6 Sequence for recommissioning of HRSG hot gas control system plant is determined to suit existing circumstances in accordance with workplace procedures
2 Operate HRSG hot gas control systemplant
- 2.1 HRSG hot gas control system plant is operated in accordance with manufacturers' recommendations and specifications, and workplace procedures
- 2.2 HRSG hot gas control system plant is monitored and observed to detect deviations from normal operating conditions in accordance with workplace procedures
- 2.3 Corrective actions are taken to rectify HRSG hot gas control system plant abnormalities in accordance with manufacturers' recommendations and specifications, and workplace procedures
3 Test and analyse HRSG hot gas control systemplant operation
- 3.1 Operational tests are performed in accordance with workplace procedures
- 3.2 HRSG hot gas control system plant is observed for correct operational response in accordance with workplace procedures
- 3.3 HRSG hot gas control system plant is returned to required operational status upon completion of test in accordance with workplace procedures
- 3.4 Cause of abnormal HRSG hot gas control system plant operating conditions are identified by analysing technical and operational information in accordance with workplace procedures
4 Monitor and inspect HRSG hot gas control system plant
- 4.1 HRSG hot gas control system plant to be monitored and inspected is physically identified in accordance with workplace procedures
- 4.2 HRSG hot gas control system plant is monitored and inspected for normal operation and to detect deviations in accordance with workplace procedures
5 Complete documentation
- 5.1 HRSG hot gas control system plant problems, movements, abnormalities and status are reported in accordance with workplace procedures
- 5.2 Documentation is updated in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAG95 | UEPOPS333 | Operate and monitor HRSG hot gas control system | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHQ7 | UEP30122 | Certificate III in ESI Generation | Qualification |
| BIO0 | UEP30322 | Certificate III in ESI Generation | Qualification |
| BHQ2 | UEP40122 | Certificate IV in ESI Generation | Qualification |
| BHP9 | UEP50122 | Diploma of ESI Generation | Qualification |