Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct off-form vertical concrete operations
Conduct off-form vertical concrete operations
Unit of competency
National Code
CPCCCO3051A
CPCCCO3051A
State Code
WI736
WI736
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040399 - Building, N.e.c.
Original Release Date
20/06/2014
Nominal Hours
32
Description
This unit of competency specifies the outcomes required to prepare and apply concrete to a slip or jump formwork structure.The unit covers sequencing, placing and compacting concrete in formwork. It may include working with others and as a member of a team.
Notes
Elements and Performance Criteria
1 Plan and prepare.
- 1.1 Work instructions, work health and safety (WHS) requirements and other information relevant to the work are identified, confirmed and applied for planning and preparation purposes.
- 1.2 Plant, tools and equipment consistent with job requirements are selected and checked for serviceability, and faults are rectified and reported before work begins.
- 1.3 Material quantity requirements are identified and calculated according to plans, specifications and quality requirements.
- 1.4 Materials appropriate to the work application are obtained, prepared, safely handled and located ready for use.
- 1.5 Environmental requirements are identified and applied for the project according to environmental plans and regulatory obligations.
2 Set out and prepare slip or jump form location.
- 2.1 Location and size of pour are set out to requirements of job drawings and specifications.
- 2.2 Equipment associated with the installation of slip or jump formwork concrete projects is prepared.
- 2.3 Edge formwork is prepared, placed and fixed with plumb and alignment to specification requirements, and is set out.
- 2.4 Form release agent is applied to slip or jump formwork with appliance or machine to specifications.
3 Place and tie reinforcement and cast-in fittings.
- 3.1 Reinforcement, accessories and cast-in fittings are checked for conformity with design and specifications.
- 3.2 Reinforcement and accessories are positioned to engineer’s drawings and specifications.
- 3.3 Reinforcement is tied and/or welded in correct placement according to engineer’s drawings and specifications.
4 Place, finish and cure concrete.
- 4.1 Sequencing of concrete placement is determined according to specifications.
- 4.2 Once transported, concrete is evenly placed into formwork in layers and consolidated to specification, avoiding material segregation and using approved compaction method.
- 4.3 Concrete surface is screeded and finished to specification ensuring cast-in fittings are clear.
- 4.4 Curing process is applied according to specification.
- 4.5 Slip or jump formwork is progressed by riggers and placement cycle is continued, avoiding cold joint.
5 Clean up.
- 5.1 Work area is cleared and materials disposed of, reused or recycled according to regulations, codes of practice and job specification.
- 5.2 Plant, tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and standard work practices.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Work health and safety requirements must comply with state and territory legislation and regulations and project safety plan, and may include:
assistance of others or the use of manual or mechanical lifting devices with handling activities where size, weight or other issues, such as disability, are a factor
emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures
hazard control
hazardous materials and substances
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Information may include:
instructions issued by authorised organisational and external personnel
memos
regulatory and legislative requirements relating to off-form vertical concreting
relevant Australian standards
safe work procedures relating to off-form vertical concreting
safety data sheets
signage
verbal, written and diagrammatical instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
Planning and preparation must include:
assessing conditions and hazards
determining work requirements and safety plans and procedures
identifying and rectifying equipment defects
inspecting work sites.
Tools and equipment:
must include:
hydraulic accessories
measuring tapes and rules
nips
shovels
slip or jump formwork
spanners
steel fixing reels
vibrators
may include:
air compressors and hoses
hammers
nail guns
power drills
power leads
power saws
rakes
saw stools
scaffolding
screed boards
spirit levels
squares
wheelbarrows.
Quality requirements must include:
internal organisational quality policy and standards
manufacturer specifications where specified
relevant regulations and Australian standards
workplace operations and procedures.
Materials may include:
cast-in fittings
concrete
foam
release agents
steel mesh.
Environmental requirements mayinclude:
clean-up management
dust and noise control
stormwater management
vibration management
waste management.
Slip or jump formwork concreting is conducted:
in conjunction with other team members involved in the slip or jump form process, including concreters, carpenters, riggers, steel fixers and electricians.
Formwork may include:
steel or timber slip or jump construction.
Reinforcement components may include:
ligatures
mesh
reinforcement bars and rods.
Sequencing must include:
minimising cold joint
timing and placement of concrete
vibrating to specified compaction.
Placing methods for concrete may include:
kibble
pumping equipment
shovelling
tremmies
truck-placed
vibrating.
Curing must include:
applied moisture
coating with a membrane
curing compounds
flooding
plastic sheeting
steam.
Work health and safety requirements must comply with state and territory legislation and regulations and project safety plan, and may include:
assistance of others or the use of manual or mechanical lifting devices with handling activities where size, weight or other issues, such as disability, are a factor
emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures
hazard control
hazardous materials and substances
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Information may include:
instructions issued by authorised organisational and external personnel
memos
regulatory and legislative requirements relating to off-form vertical concreting
relevant Australian standards
safe work procedures relating to off-form vertical concreting
safety data sheets
signage
verbal, written and diagrammatical instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
Planning and preparation must include:
assessing conditions and hazards
determining work requirements and safety plans and procedures
identifying and rectifying equipment defects
inspecting work sites.
Tools and equipment:
must include:
hydraulic accessories
measuring tapes and rules
nips
shovels
slip or jump formwork
spanners
steel fixing reels
vibrators
may include:
air compressors and hoses
hammers
nail guns
power drills
power leads
power saws
rakes
saw stools
scaffolding
screed boards
spirit levels
squares
wheelbarrows.
Quality requirements must include:
internal organisational quality policy and standards
manufacturer specifications where specified
relevant regulations and Australian standards
workplace operations and procedures.
Materials may include:
cast-in fittings
concrete
foam
release agents
steel mesh.
Environmental requirements mayinclude:
clean-up management
dust and noise control
stormwater management
vibration management
waste management.
Slip or jump formwork concreting is conducted:
in conjunction with other team members involved in the slip or jump form process, including concreters, carpenters, riggers, steel fixers and electricians.
Formwork may include:
steel or timber slip or jump construction.
Reinforcement components may include:
ligatures
mesh
reinforcement bars and rods.
Sequencing must include:
minimising cold joint
timing and placement of concrete
vibrating to specified compaction.
Placing methods for concrete may include:
kibble
pumping equipment
shovelling
tremmies
truck-placed
vibrating.
Curing must include:
applied moisture
coating with a membrane
curing compounds
flooding
plastic sheeting
steam.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by undertaking a range of tasks in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
complete planning, preparation, reinforcement placement and installation of block out; install cast-in fittings; and sequence, place, finish and cure concrete, minimising cold joint and undertaking compaction of concrete for one slip or jump form to engineer’s specifications
locate, interpret and apply relevant information, standards and specifications relating to conducting off-form vertical concrete operations
comply with site safety plans and procedures
comply with organisational policies and procedures relating to conducting off-form vertical concrete operations while maintaining quality requirements outlined in job specifications
safely and effectively operate and use plant, tools and equipment required to conduct off-form vertical concrete operations
communicate and work effectively and safely with others during each stage of the work task.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks or simulated tasks covering the mandatory task requirements
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
research resources and industry-related systems information
safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Overview of assessment
This unit of competency could be assessed by undertaking a range of tasks in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
complete planning, preparation, reinforcement placement and installation of block out; install cast-in fittings; and sequence, place, finish and cure concrete, minimising cold joint and undertaking compaction of concrete for one slip or jump form to engineer’s specifications
locate, interpret and apply relevant information, standards and specifications relating to conducting off-form vertical concrete operations
comply with site safety plans and procedures
comply with organisational policies and procedures relating to conducting off-form vertical concrete operations while maintaining quality requirements outlined in job specifications
safely and effectively operate and use plant, tools and equipment required to conduct off-form vertical concrete operations
communicate and work effectively and safely with others during each stage of the work task.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks or simulated tasks covering the mandatory task requirements
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
research resources and industry-related systems information
safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D7369 | CPCCCO3031A | Conduct off-form vertical concrete operations | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAP27 | CPCCCO3051 | Conduct off-form vertical concrete operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J784 | CPC30313 | Certificate III in Concreting | Qualification |