Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Modify plant
Modify plant
Unit of competency
National Code
PMAOPS600
PMAOPS600
State Code
AXM68
AXM68
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
05/08/2016
Field of Education
030101 - Manufacturing Engineering
Original Release Date
05/08/2016
Nominal Hours
60
Description
This unit of competency covers the skills and knowledge required to modify plant hardware. This unit of competency applies to senior technicians or those in similar roles who are required to apply in-depth technical knowledge of process and plant operation in order to determine operational and technical requirements, develop technical specifications, evaluate options against specifications, select the most appropriate option, and coordinate and supervise the installation and commissioning of the modified equipment.This unit does not apply to: identification of the need for modification; the need for the modification may arise from a continuous improvement project, as a result of an analysis of plant performance or from any other sourcedesign of equipment; this would typically be an engineering role work requiring special certification (e.g. registered structural engineer)No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Confirm required outcomes from modification
- 1.1 Communicate with relevant technical, operational and other key personnel to determine operational and technical requirements of the plant modification
- 1.2 Determine regulatory/industry code requirements
- 1.3 Obtain relevant drawings of existing plant
- 1.4 Develop modification brief, including relevant plant schematic sketch, to meet needs
- 1.5 Establish required performance measures to indicate success of project
- 1.6 Obtain sign-off on modification brief from all relevant persons
2 Short list possible modifications to meet brief
- 2.1 Investigate the range of available equipment/plant units
- 2.2 Determine relative advantages and disadvantages between of each class of equipment/type of modification which may provide a solution
- 2.3 Compile a shortlist of modification types/equipment classes which will best meet the modification brief
- 2.4 Discuss shortlist alternatives with relevant stakeholders and obtain sign-off for the chosen approach
3 Select technically best equipment/unit/modification
- 3.1 Complete technical specification for required modification incorporating feedback received
- 3.2 Compare specification with that of 'off the shelf' equipment, where appropriate
- 3.3 Arrange for equipment suppliers to tender to the specification, where necessary, following company procedures
- 3.4 Rank competing items by their compliance with the technical specification
4 Compare hazard profile of possible modifications
- 4.1 Organise a hazard analysis (e.g. hazard and operability study (HAZOP)) for the modification according to company procedures
- 4.2 Ensure that all stakeholders are represented on the hazard analysis team
- 4.3 Brief the hazard analysis team on the modification and the alternatives under evaluation
- 4.4 Eliminate alternatives which do not meet hazard requirements.
- 4.5 Rank remaining competing items by safety performance.
5 Make final choice of solution
- 5.1 Evaluate competing items by their economic performance (e.g. life, maintenance and running costs) and rank by total lifetime cost
- 5.2 Seek further information where necessary to allow a rational selection to be made
- 5.3 Choose the modification which meets all required minimum standards (regulatory, enterprise, output and economic) and will provide the best solution
- 5.4 Verify choice in discussion with production and engineering managers and other key stakeholders
- 5.5 Arrange for order to be placed, following company procedures
6 Check and commission modification
- 6.1 Undertake pre-commissioning activities
- 6.2 Complete safety acceptance documentation
- 6.3 Identify, record and report problems or non-conformances
- 6.4 Conduct trials/test runs
- 6.5 Record and report performance data
- 6.6 Bring the plant/plant systems/pipeline on line
7 Complete modification
- 7.1 Evaluate performance of modification
- 7.2 Make adjustments as required
- 7.3 Accept (or otherwise) the equipment/unit (and ensure payment flows)
- 7.4 Ensure plant procedures and training material updated
- 7.5 Ensure plant drawings and engineering specifications are updated
- 7.6 Complete all other required paperwork
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8902 | PMAOPS600C | Modify plant | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BCU5 | PMC60116 | Advanced Diploma of Manufactured Mineral Products | Qualification |
| BAM9 | PMA60116 | Advanced Diploma of Process Plant Technology | Qualification |