Unit of competency Outline

Date retreived
22/07/2026 2:38 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Program and monitor computerised equipment

Program and monitor computerised equipment

Unit of competency
National Code
AUM4014A
State Code
W9159
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
01/09/2008
State Implementation and Classification
Approved Date
03/03/2011
Field of Education
080905 - Practical Computing Skills
Original Release Date
03/03/2011
Nominal Hours
90
Description
This unit describes the application of the required skills and knowledge to program and monitor computerised equipment with plant, tooling, equipment or systems required for the design, development and production of motor vehicles.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Program computerised equipment
  • 1.1. Applicable organisation requirements relevant to program and monitor computerised equipment are verified and complied with throughout the work activity
  • 1.2. Instructions and plans are read and interpreted to identify processes and materials to complete work tasks
  • 1.3. Electronic/microprocessor controlled equipment related to automotive development, final control modules or other computerised equipment are prepared for programming
  • 1.4. Programmed electronic/microprocessor controlled equipment related to automotive development, final control modules or other computerised equipment is tested against job specifications
2. Step-through and monitor the operations of electronic/ microprocessor controlled equipment
  • 2.1. Electronic/microprocessor related to automotive development, final control modules or other computerised equipment controlled equipment is setup
  • 2.2. Operations of the electronic/microprocessor controlled equipment related to automotive development, final control modules, or other computerised equipment are stepped-through and monitored
  • 2.3. Any malfunctions of the electronic/microprocessor controlled equipment related to automotive development, final control modules, or other computerised equipment is identified and reported
3. Identify and diagnose fault conditions in electronic/ microprocessor controlled equipment
  • 3.1. Cause of malfunction in an electronic/microprocessor controlled equipment is diagnosed with the aid of fault-finding guides
  • 3.2. A counter measure is proposed to rectify the malfunction
4. Rectify faults in electronic/ microprocessor controlled equipment
  • 4.1. Identified malfunction of electronic/microprocessor controlled equipment is reported and/or rectified
  • 4.2. Required counter measures are programmed into computerised equipment
  • 4.3. Revised program is tested, faults rectified and cleared for operational use
5. Document programming, monitoring and repairs to electronic/ microprocessor controlled equipment.
  • 5.1. Programming of the electronic/microprocessor controlled equipment is documented
  • 5.2. Outcomes of the step-through and monitoring of operations of the electronic/microprocessor controlled equipment and any related fault rectification action are documented
  • 5.3. Documentation on the outcomes of the step-through and monitoring of the operations of the electronic/ microprocessor controlled equipment related to automotive development, and any related fault rectification action is stored and/or distributed to appropriate personnel
  • 5.4. System/data/program is backed up where applicable
access and equity principles and practices
environmental management (waste disposal, recycling and re-use guidelines)
emergency and evacuation procedures
equipment use procedures
ethical standards
legal obligations
maintenance and storage procedures
OHS requirements
organisational and site guidelines
policies and procedures relating to own role and responsibility
procedural manuals
quality assurance guidelines
quality and continuous improvement processes and standards
recording and reporting guidelines.

programming and monitoring electronic/ microprocessor controlled equipment related to automotive development
knowledge of final control modules and other computerised equipment in projects in the design
development
production of motor vehicles.

workplace procedures relating to the use and operation of tools and equipment
departmental requirements
workplace instructions, including job sheets, plans, specifications, drawings and designs
workplace procedures relating to reporting and communications
manufacturers' instructions for the use of equipment and materials.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of the following is essential:

compliance with relevant legislation, regulations, standards, codes of practice and established safe practices and organisation policies and procedures for programming and monitoring electronic/microprocessor controlled equipment related to automotive development, final control modules and other computerised equipment
working and communicating effectively and positively with others involved in the work

applying, within authority, the requirements of the job or work role in relation to:

using computers and computerised equipment
using displays in plant, tooling, equipment or systems
achieving work quality goals
completing work area housekeeping requirements including the documentation of project activity and process outcomes

Context of, and specific resources for assessment
assessment of the competency should take place in a safe working environment in a passenger motor vehicle manufacturing plant or simulated environment using tools/equipment/machinery required for the production process without undue disruption to the production process
assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints.

Method of assessment

A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:

assessment methods must confirm consistency and accuracy of performance (over time and in a range of organisation relevant contexts) together with application of underpinning knowledge
assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application
assessment may be applied under project related conditions (real or simulated) and require evidence of process
assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances.

Replaces
State Code National Code Title Type
AXY70 AUM4703A Program and monitor PLCs, robots and other computerised equipment - Complex Unit of competency