Unit of competency Outline
Information current as of
20/10/2026 7:50 PM AWST
20/10/2026 7:50 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Inspect, test and maintain joints on diesel engine systems
Inspect, test and maintain joints on diesel engine systems
Unit of competency
National Code
RIIDES302
RIIDES302
State Code
WC348
WC348
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
16/08/2012
Original Release Date
21/03/2012
Nominal Hours
40
Field of Education
030503 - Vehicle Mechanics
Description
This unit covers the inspection, testing and maintenance of joints on diesel engine systems for underground coal mines to provide the means of confirming the effectiveness of their explosion and fire protection and emission control. It includes: planning and preparing for and inspection, testing, routine maintenance and overhaul tasks on joints; and the completion of post-work requirements
General notes
N/A
Elements and Performance Criteria
1. Plan for inspection, testing and/or maintenance tasks
- 1.1 Access, interpret and apply compliance and other documentation relevant to the inspection, testing and maintenance of joints on diesel engine systems
- 1.2 Obtain, interpret and clarify work requirements for the satisfactory completion of tasks
- 1.3 Resolve coordination requirements with others at the site prior to commencing and during work activities
2. Prepare for inspection, testing and/or maintenance tasks
- 2.1 Inspect and prepare work area incoordination with others
- 2.2 Identify and obtain items and toolsrequired for the safe, effective and efficient conduct of the tasks.
- 2.3 Identify and arrange support required completion of the tasks
- 2.4 Select and use personal protection equipment appropriate to the task
- 2.5 Carry out equipment pre-start procedures
- 2.6 Carry out required isolation and lock-out of all equipment necessary for the safe execution of tasks
- 2.7 Recognise and respond to hazardous and emergency situations
3. Carry out inspection of diesel engine system joints
- 3.1 Carry out inspection and fault finding of joints on fixed connections for the effectiveness of their explosion and fire protection
- 3.2 Carry out inspection and fault finding of open joints for the effectiveness of their explosion and fire protection
- 3.3 Diagnose and record existing or identified faults
4. Carry out testing of diesel engine system joints
- 4.1 Select and operate testing equipment and methods
- 4.2 Carry out testing of joints on fixed connections for effectiveness of explosion and fire protection
- 4.3 Carry out testing of open joints for the effectiveness of explosion and fire protection
- 4.4 Identify and record existing or potential faults
5. Carry out routine maintenance of diesel engine system joints
- 5.1 Select and use maintenance items, tools and equipment Rectify diagnosed and identified faults
- 5.2 Carry out routine maintenance of joints on fixed connections to ensure effectiveness of their explosion and fire protection
- 5.3 Carry out routine maintenance of open joints for the effectiveness of their explosion and fire protection
6. Carry out the overhaul of diesel engine systems joints
- 6.1 Select and use overhaul items, tools and equipment
- 6.2 Carry out overhaul of joints on diesel engine systems in accordance with the work requirements and Australian Standards
- 6.3 Recognise and respond to hazardous and emergency situations
7. Complete post-work activity requirements
- 7.1 Tidy up the work area
- 7.2 Dispose of used oil, lubricant and other waste
- 7.3 Return and secure all tools and re-usable items
- 7.4 Report outcomes of inspection, testing, maintenance and overhaul tasks to appropriate person
- 7.5 Complete and maintain inspection, testing and maintenance records
Compliance and other documentation may include:
certification documentation
approval documentation
legislative, organisation and site requirements and procedures
manufacturer’s specifications and guidelines
Australian Standards, including: AS/NZS3584 and AS 4291
codes of practice
Employment and Workplace Relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Inspection may include:
checking the marking of parts/components
visually check that the fasteners securing explosion-protected joints are in place and correctly located, including:
nuts
bolts
studs
confirmation of the dimensional, flatness and surface finish conformance of all joint mating parts
confirmation of the conformance of all threaded holes and fasteners to drawings and specifications
Testing may include:
testing the accessible external open joints (flamepaths) for compliance with the manufacturer’s specification and the drawings for maximum gap
testing accessible external fixed connections for gas tightness in a manner recommended by the manufacturer
correct tightening torque of all fasteners.
conducting gas tightness tests for all joints within the exhaust system
conducting gas tightness tests for all joints within the intake system
Maintenance is:
the combination of actions carried out to retain a diesel engine system in, or to restore it to, conditions in which it is able to meet the requirements of the relevant specification and perform its required function
Maintenance may include authorised:
service
adjusting
replacing
repair
overhaul
modification
Joints may include:
fixed connections, including:
metallic and/or flameproof gaskets
o-rings on fuel systems
open joints, including:
valve stems and valve guides
intake and exhaust flametraps
water injection nozzles
turbo-charger and/or supercharger, where flame trap is fitted to inlet side
fuel injectors
Diesel engine systems are:
diesel engines for underground coal mines and their:
inlet systems
exhaust systems
cooling systems
starting systems
shut-down and protection systems
electrical or electronic devices
Work requirements may come from briefings, handovers, and work orders and may include:
nature and scope of tasks
procedures to be applied
quality standards to be applied
available resources
achievement targets
operational conditions
site layout
out-of-bounds areas
designated safe areas
explosion-risk zones
hazardous areas
other hazards and potential hazards
obtaining permits required
worksite inspection requirements
lighting conditions
plant or equipment defects
coordination requirements or issues
Others may include:
other maintenance personnel
support providers
contractors
under-ground production personnel
mobile or fixed plant operators
Inspect and prepare work area may include:
determining if the proposed work area is a designated safe area
identification of explosion-risk zones
identification of hazardous areas
identification of hazards, including:
workshop work area hazard
underground work area hazards, and
work activity hazards
fire
explosion
emissions
selection and implementation of control measures for the hazards identified
safeguarding site and non-site personnel by:
erection of barricades and posting of signs
selection of appropriate equipment to ensure personnel safety and protection
Items may include:
authorised replacement parts
fasteners as specified in manufacturer’s drawings, including:
tensile strength
head and nut configuration
thread form and engagement
corrosion resistance (materials)
coatings (materials and application)
tolerances for fits and threads
tolerances for mating surfaces
dimensions of clearance holes
fixing torques
lubricants and anti-seize compounds used
packing materials
Tools may include:
hand tools
power tools
special tools
Support may include:
other site personnel
contractors
cranes
other lifting equipment
Personal protection equipment may include:
hard hats
eye protection
hearing protection
breathing apparatus
gas/fume masks
prescribed footwear
Pre-start procedures include:
checking:
cleanliness, particularly coal dust
diesel and other flammable liquid leaks
coolant leaks in radiator or radiator hoses
coolant level
that guards are in place and secure
engine oil level is correct
conduct exhaust conditioner/flametrap, low-water, shutdown tests
Hazardous and emergency situations may include:
working alone
personal injury
fire
explosions
emissions
electrical
noise
dust
noxious gases
environmental
chemical
Diagnose faults may include:
root cause analysis
troubleshooting techniques
Routine maintenance is to include:
servicing, including cleaning
adjusting
replacing
Overhaul may include:
removal
dismantling
cleaning
inspecting
replacing, eg:
gaskets
fasteners
testing, including:
flatness
measuring dimensions
hydrostatic
reassembly
reinstallation
Records may include:
inspection and test results
defect identified
defect rectification carried out
item consumed
hazard/risk management reports
certification documentation
approval documentation
legislative, organisation and site requirements and procedures
manufacturer’s specifications and guidelines
Australian Standards, including: AS/NZS3584 and AS 4291
codes of practice
Employment and Workplace Relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Inspection may include:
checking the marking of parts/components
visually check that the fasteners securing explosion-protected joints are in place and correctly located, including:
nuts
bolts
studs
confirmation of the dimensional, flatness and surface finish conformance of all joint mating parts
confirmation of the conformance of all threaded holes and fasteners to drawings and specifications
Testing may include:
testing the accessible external open joints (flamepaths) for compliance with the manufacturer’s specification and the drawings for maximum gap
testing accessible external fixed connections for gas tightness in a manner recommended by the manufacturer
correct tightening torque of all fasteners.
conducting gas tightness tests for all joints within the exhaust system
conducting gas tightness tests for all joints within the intake system
Maintenance is:
the combination of actions carried out to retain a diesel engine system in, or to restore it to, conditions in which it is able to meet the requirements of the relevant specification and perform its required function
Maintenance may include authorised:
service
adjusting
replacing
repair
overhaul
modification
Joints may include:
fixed connections, including:
metallic and/or flameproof gaskets
o-rings on fuel systems
open joints, including:
valve stems and valve guides
intake and exhaust flametraps
water injection nozzles
turbo-charger and/or supercharger, where flame trap is fitted to inlet side
fuel injectors
Diesel engine systems are:
diesel engines for underground coal mines and their:
inlet systems
exhaust systems
cooling systems
starting systems
shut-down and protection systems
electrical or electronic devices
Work requirements may come from briefings, handovers, and work orders and may include:
nature and scope of tasks
procedures to be applied
quality standards to be applied
available resources
achievement targets
operational conditions
site layout
out-of-bounds areas
designated safe areas
explosion-risk zones
hazardous areas
other hazards and potential hazards
obtaining permits required
worksite inspection requirements
lighting conditions
plant or equipment defects
coordination requirements or issues
Others may include:
other maintenance personnel
support providers
contractors
under-ground production personnel
mobile or fixed plant operators
Inspect and prepare work area may include:
determining if the proposed work area is a designated safe area
identification of explosion-risk zones
identification of hazardous areas
identification of hazards, including:
workshop work area hazard
underground work area hazards, and
work activity hazards
fire
explosion
emissions
selection and implementation of control measures for the hazards identified
safeguarding site and non-site personnel by:
erection of barricades and posting of signs
selection of appropriate equipment to ensure personnel safety and protection
Items may include:
authorised replacement parts
fasteners as specified in manufacturer’s drawings, including:
tensile strength
head and nut configuration
thread form and engagement
corrosion resistance (materials)
coatings (materials and application)
tolerances for fits and threads
tolerances for mating surfaces
dimensions of clearance holes
fixing torques
lubricants and anti-seize compounds used
packing materials
Tools may include:
hand tools
power tools
special tools
Support may include:
other site personnel
contractors
cranes
other lifting equipment
Personal protection equipment may include:
hard hats
eye protection
hearing protection
breathing apparatus
gas/fume masks
prescribed footwear
Pre-start procedures include:
checking:
cleanliness, particularly coal dust
diesel and other flammable liquid leaks
coolant leaks in radiator or radiator hoses
coolant level
that guards are in place and secure
engine oil level is correct
conduct exhaust conditioner/flametrap, low-water, shutdown tests
Hazardous and emergency situations may include:
working alone
personal injury
fire
explosions
emissions
electrical
noise
dust
noxious gases
environmental
chemical
Diagnose faults may include:
root cause analysis
troubleshooting techniques
Routine maintenance is to include:
servicing, including cleaning
adjusting
replacing
Overhaul may include:
removal
dismantling
cleaning
inspecting
replacing, eg:
gaskets
fasteners
testing, including:
flatness
measuring dimensions
hydrostatic
reassembly
reinstallation
Records may include:
inspection and test results
defect identified
defect rectification carried out
item consumed
hazard/risk management reports
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for the inspection, testing and maintenance of joints on diesel engine systems
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of the inspection, testing and maintenance of joints on diesel engine systems
working with others to undertake and complete the inspection, testing and maintenance of joints on diesel engine systems that meets all of the required outcomes
consistent timely completion of the inspection, testing and maintenance of joints on diesel engine systems that safely, effectively and efficiently meets the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate’s required knowledge
observed, documented and/or first hand testimonial evidence of the candidate’s:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistently achieving the required outcomes
first hand testimonial evidence of the candidate:
working with others to undertake and complete the inspection, testing and maintenance of joints on diesel engine systems
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for the inspection, testing and maintenance of joints on diesel engine systems
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of the inspection, testing and maintenance of joints on diesel engine systems
working with others to undertake and complete the inspection, testing and maintenance of joints on diesel engine systems that meets all of the required outcomes
consistent timely completion of the inspection, testing and maintenance of joints on diesel engine systems that safely, effectively and efficiently meets the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate’s required knowledge
observed, documented and/or first hand testimonial evidence of the candidate’s:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistently achieving the required outcomes
first hand testimonial evidence of the candidate:
working with others to undertake and complete the inspection, testing and maintenance of joints on diesel engine systems
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH241 | RIIDES302D | Inspect, test and maintain joints on diesel engine systems | Unit of competency |