Unit of competency Outline

Date retreived
23/07/2026 12:16 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Store liquids in bulk

Store liquids in bulk

Unit of competency
National Code
PMAOPS240A
State Code
C5959
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
25/11/2002
State Implementation and Classification
Approved Date
04/03/2005
Field of Education
089901 - Purchasing, Warehousing And Distribution
Original Release Date
04/03/2005
Nominal Hours
30
Description
Notes
Elements and Performance Criteria
No information
Context
This unit of competency includes all such items of equipment and unit operations, which form part of the storage and loading system.

For your facility this may include (select relevant items):
tanks
vessels
pumps
compressors
road or rail tanker loading facilities
gauges
fire protection and deluge systems
inert gas blanketing or purging systems (e.g. nitrogen)
gas detection systems and equipment
tank dipping and measurement equipment.

Product may include any liquid chemical or product used in the plant and stored in bulk.

Typical problems for your facility may include:
interruptions to loading through adverse weather conditions
selection of appropriate storage facility
control of temperature and pressure
variations in feed
vibration
tank capacities and space.

HSE
All operations to which this unit applies are subject to stringent health, safety and environment requirements, which may be imposed through State or Federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and HSE requirements, the HSE requirements take precedence.
Assessment context and methods
Assessment for this unit of competency will be on an operating plant or storage facility. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.

Simulation may be required to allow for timely assessment of parts of this unit of competency (e.g. elements 3 and 4). Simulation should be based on the actual plant and will include walk throughs of the relevant competency components. Simulations may also include the use of case studies/scenarios and role plays.

This unit of competency requires a significant body of knowledge which will be assessed through questioning and the use of what if scenarios both on the plant (during demonstration of normal operations and walk throughs of abnormal operations) and off the plant.

Critical aspects
Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action. The emphasis should be on the ability to stay out of trouble rather than on recovery from a disaster.

Consistent performance should be demonstrated. In particular look to see that:
early warning signs of equipment/processes needing attention or with potential problems are recognised
the range of possible causes can be identified and analysed and the most likely cause determined
appropriate action is taken to ensure a timely return to full performance
obvious problems in related plant areas are recognised and an appropriate contribution made to their solution.

These aspects may be best assessed using a range of scenarios/case studies/what ifs as the stimulus with a walk through forming part of the response. These assessment activities should include a range of problems, including new, unusual and improbable situations which may have been generated from the past incident history of the plant, incidents on similar plants around the world, hazard analysis activities and similar sources.

Resource implications
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.

Other assessment advice
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units. Consider co-assessment with:
PMAOPS201A - Operate fluid flow equipment.

In a major hazard facility, it may be appropriate to assess this unit concurrently with:
PMAOHS200 - Participate in workplace safety procedures.

Essential knowledge
Demonstration of competence in this unit must include knowledge of the following:
identify all items on a schematic of the tank farm and describe the function of each
testing techniques
equipment isolation and purging
use and operation of safety equipment (including breathing apparatus if required)
tank and product mixes
flow rates and measures
tank capacities and percentages
static electricity principles.

Sound knowledge of storage and transfer techniques required for transport of oil, gas or water is expected.
Replaced By
State Code National Code Title Type
W8861 PMAOPS240B Store fluids in bulk Unit of competency
No information