Unit of competency Outline
Date retreived
22/07/2026 8:06 PM AWST
22/07/2026 8:06 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Maintain trackside signal and train protection equipment
Maintain trackside signal and train protection equipment
Unit of competency
National Code
UEERS0032
UEERS0032
State Code
OFD92
OFD92
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
19/04/2023
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
19/04/2023
Nominal Hours
36
Description
This unit involves the skills and knowledge required to maintain trackside signal and train protection equipment.It includes preparing and maintaining trackside signal and train protection equipment. It also includes completing maintenance of trackside signal and train protection equipment and repairing faults, performing operational tests and reporting requirements.Persons achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and comply with relevant codes of practice, rules and/or guidelines.No other licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to maintain trackside signal and train protection equipment
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified
- 1.2 Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures implemented in preparation for work
- 1.3 Safety hazards that have not previously been identified are documented as part of the job safety assessments, and risk control measures are determined and implemented in consultation with appropriate person/s
- 1.4 Appropriate rail safe working person/s is consulted to ensure work can proceed without delaying or compromising rail operational safety of train movements
- 1.5 Materials needed for the maintenance work are obtained in accordance with workplace procedures and checked against job specifications
- 1.6 Tools, equipment and testing devices needed for maintenance work are obtained in accordance with workplace procedures and checked for correct operation and safety
- 1.7 Authorisation to take temporarily out of service or disable systems is obtained in accordance with workplace procedures
2 Maintain trackside signal and train protection equipment
- 2.1 WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
- 2.2 On-track safe working requirements are identified and applied in accordance with workplace procedures and safety management system
- 2.3 Signal and train protection equipment are checked in accordance with job and technical specifications
- 2.4 Sub-assemblies of signal and train protection equipment are assembled in accordance with work/job specifications and checked to confirm circuit integrity
- 2.5 Assembled sub-assemblies are inspected and tested off-site, where possible, in accordance with job and technical specifications
- 2.6 Maintenance, wiring and assembly of signal and train protection equipment are completed efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
- 2.7 Signal and train protection components and sub-assemblies are inspected, checked and installed in accordance with job specifications
- 2.8 Component and wiring test/s are conducted under live test conditions to ensure train protection equipment functions correctly
- 2.9 Methods for dealing with unplanned situations are determined on the basis of safety and specified work outcomes
- 2.10 Maintenance work is carried out in accordance with manufacturer specifications, workplace procedures and relevant industry standards
- 2.11 Appropriate operational inspection and test procedures are applied to ensure equipment and components are operational
- 2.12 Signal/s and train protection equipment are monitored, inspected and tested to ensure they operate in accordance with technical parameters specified and job specifications
- 2.13 Testing is performed efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
3 Complete trackside signal and train protection equipment maintenance
- 3.1 WHS/OHS work completion risk control measures and workplace procedures are followed
- 3.2 Confirmation that system is functional and that no alarms are present or indicated
- 3.3 Worksite is made safe in accordance with workplace safety management procedures
- 3.4 On-track safe working requirements are removed in accordance with workplace procedures and safety management system
- 3.5 Test results and documentation are completed to confirm system operational compliance to job specifications and relevant reports produced
- 3.6 Work completion is documented and appropriate rail safety person/s notified in accordance with workplace safe working procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| OBX77 | UEERS0012 | Install and maintain trackside signal and train protection equipment | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BJD4 | UEE41223 | Certificate IV in Rail Signalling | Qualification |