Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Lay irrigation and/or drainage pipes
Lay irrigation and/or drainage pipes
Unit of competency
National Code
AHCIRG204A
AHCIRG204A
State Code
D6869
D6869
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
04/08/2014
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
04/08/2014
Nominal Hours
20
Description
This unit covers the process of laying irrigation and/or drainage pipes and defines the standard required to: set out and excavate trenches using manual equipment and a machine operator; check trench depth and grade; lay bedding materials; position irrigation and/or drainage of varying types and sizes; install pipe joints and fittings to job specification.
Notes
Elements and Performance Criteria
1. Plan and prepare job
- 1.1. Materials required for the job are transported to the location and stacked in a safe position.
- 1.2. Tools, equipment and machinery are selected consistent with the requirements of the job.
- 1.3. Quality Assurance requirements are recognised and adhered to.
- 1.4. Personal Protective Equipment (PPE) is used and maintained according to procedures.
- 1.5. Occupational Health and Safety (OHS) hazards are identified and safety concerns reported to the supervisor.
2. Set out and excavate trenches
- 2.1. Location and depths of trenches is determined from job drawings.
- 2.2. Trench location is set out with pegs and string line and clearly marked with appropriate marking material.
- 2.3. Manual support is provided to machine operator with excavation of trenches, shoring or battering in accordance with OHS requirements.
- 2.4. Trenches are cleaned out by hand and corners left square.
- 2.5. Trench depths and grades are checked for conformity to job requirements.
3. Lower and position pipes
- 3.1. Bedding materials are laid and consolidated to specified depths and grades.
- 3.2. Pipes are installed/lowered into position with appropriate mechanical equipment according to specifications.
- 3.3. Pipe joints and fittings are installed to job specification.
- 3.4. Pipes are back filled to specifications and cover left level with surrounding ground.
4. Clean up
- 4.1. Site is cleared and excess soil, debris and unwanted materials removed in accordance with organisational procedures and environmental requirements.
- 4.2. Tools and equipment are cleaned, maintained and stored.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole.
Irrigation and drainage pipes may include:
concrete
metal
polythene
polyvinylchloride (PVC)
the type and size of pipe will vary with the terrain, soil type and traffic load.
Fittings may include:
valves
outlets
thrust blocks and connecting surfaces such as O-rings.
Mechanical equipment may include:
equipment for lowering irrigation and/or drainage pipes but does not include operating excavation machinery such as trench diggers or ditch witches.
The range statement relates to the unit of competency as a whole.
Irrigation and drainage pipes may include:
concrete
metal
polythene
polyvinylchloride (PVC)
the type and size of pipe will vary with the terrain, soil type and traffic load.
Fittings may include:
valves
outlets
thrust blocks and connecting surfaces such as O-rings.
Mechanical equipment may include:
equipment for lowering irrigation and/or drainage pipes but does not include operating excavation machinery such as trench diggers or ditch witches.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
set out and excavate trenches using manual equipment and a machine operator
check trench depth and grade
lay bedding materials
position irrigation and/or drainage of varying types and sizes
install pipe joints and fittings to job specification.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
set out and excavate trenches using manual equipment and a machine operator
check trench depth and grade
lay bedding materials
position irrigation and/or drainage of varying types and sizes
install pipe joints and fittings to job specification.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S3531 | RTE2603A | Lay irrigation and/or drainage pipes | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D451 | AHC20110 | Certificate II in Agriculture | Qualification |
| J609 | FPI20113 | Certificate II in Forest Growing and Management | Qualification |
| J458 | FPI20111 | Certificate II in Forest Growing and Management | Qualification |
| D454 | AHC20410 | Certificate II in Horticulture | Qualification |
| D461 | AHC21110 | Certificate II in Irrigation | Qualification |
| J155 | AHC21112 | Certificate II in Irrigation | Qualification |
| D466 | AHC21610 | Certificate II in Landscaping | Qualification |
| D456 | AHC20610 | Certificate II in Parks and Gardens | Qualification |
| D453 | AHC20310 | Certificate II in Production Horticulture | Qualification |