Unit of competency Outline
Date retreived
22/07/2026 8:22 AM AWST
22/07/2026 8:22 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and fix residential acoustic plaster products
Install and fix residential acoustic plaster products
Unit of competency
National Code
CPCCPB3021
CPCCPB3021
State Code
OCQ20
OCQ20
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040317 - Plastering
Original Release Date
01/06/2021
Nominal Hours
30
Description
This unit of competency specifies the skills and knowledge required to install residential acoustic plaster systems.A person working at this level would be expected to take responsibility for organising and completing tasks assigned to them without close supervision.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001 Prepare to work safely in the construction industry meets this requirement.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare.
- 1.1 Read and interpret work instructions and plan sequence of work.
- 1.2 Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, and workplace requirements.
- 1.3 Select and use personal protective equipment (PPE) for each stage of the task.
- 1.4 Inspect work site, assess hazards and apply risk controls, including required signage and barricades.
- 1.5 Select materials required for task, including fasteners, sealers and penetration seals compatible with system performance requirements, calculate quantities, handle safely and prepare and position ready for use.
- 1.6 Select tools and equipment, check for serviceability and report any faults that may affect the safe operation of the equipment, tag equipment and set aside.
2 Fix acoustic system.
- 2.1 Install acoustic systems to manufacturers' specifications.
- 2.2 Caulk edges of board.
- 2.3 Check completed work to confirm that it meets installation specifications and requirements.
3 Clean up.
- 3.1 Clear work area and dispose of, reuse or recycle materials.
- 3.2 Clean, check, maintain and store tools and equipment in accordance with manufacturers’ specifications.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9461 | CPCCPB3021A | Install and fix residential acoustic plaster products | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGD5 | CPC31220 | Certificate III in Wall and Ceiling Lining | Qualification |