Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Create and conduct isolations in the workplace
Create and conduct isolations in the workplace
Unit of competency
National Code
PMAOPS347
PMAOPS347
State Code
OCK91
OCK91
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
09/03/2021
Field of Education
030717 - Plant And Machine Operations
Original Release Date
09/03/2021
Nominal Hours
60
Description
This unit of competency describes the skills and knowledge required to isolate and prepare a plant for maintenance work, maintain isolations, remove isolation and return a plant to service.This unit of competency applies to operators, maintainers and those in similar roles who are required to create and conduct isolations and de-isolations, and reinstate equipment in an industrial installation. The person will have detailed operational and process knowledge and may work alone or as part of a team. The person will usually report through to a permit co-ordinator, supervisor or central-control-room operator.Creation and implementation of the isolation requires appropriate consideration of known plant equipment and/or systems not functioning according to design. This typically includes but is not limited to passing valves, blocked lines, drains and system dead legs.No licensing, legislative or certification requirements exist at the time of publication. Relevant legislation, industry standards and codes of practice within Australia must be applied.
Notes
Elements and Performance Criteria
1. Plan and prepare for isolations according to procedures
- 1.1 Communicate with relevant stakeholders to confirm the scope of work, and the need for timing of the isolation
- 1.2 Identify hazards in the system that need to be controlled to a state of zero energy
- 1.3 Create appropriate isolation documents using current workplace isolation procedures
- 1.4 Verify isolation design
- 1.5 Submit isolation documentation according to workplace isolation submission chain-of-custody requirements
2. Conduct isolations
- 2.1 Confirm with stakeholders that isolation is ready to proceed
- 2.2 Conduct the isolation according to isolation design and operating procedures
- 2.3 Remove energy input and hazardous inventory in accordance with operating procedures
- 2.4 Ensure isolation integrity is performed according to operating procedures
- 2.5 Participate in appropriate handovers of equipment and isolation documentation according to operating procedures
3. Maintain Isolations
- 3.1 Maintain isolation integrity according to operating procedures
- 3.2 Take corrective action when isolation integrity is no longer effective
4. Conduct de- isolations
- 4.1 Confirm process plant is mechanically complete
- 4.2 Obtain de-isolation documentation according to operating procedures
- 4.3 De-isolate and reinstate plant according to operating procedures
- 4.4 Maintain appropriate communication with relevant stakeholders
- 4.5 Finalise documentation according to operating procedures
No information
No information
No information
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGB2 | PMA30120 | Certificate III in Process Plant Operations | Qualification |