Unit of competency Outline

Date retreived
22/07/2026 1:28 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install and fit off sanitary fixtures, water services and adjust water service controls

Install and fit off sanitary fixtures, water services and adjust water service controls

Unit of competency
National Code
CPCPWT3026
State Code
OCM63
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
27/11/2020
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040327 - Plumbing
Original Release Date
01/06/2021
Nominal Hours
40
Description
This unit specifies the skills and knowledge required to fit off and commission heated, tempered and cold-water services to sanitary fixtures. It includes installing and fitting sanitary fixtures and adjusting water service controls and devices. In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.
Notes
Elements and Performance Criteria
1 Identify installation requirements.
  • 1.1 Access, read and determine fixture and service installation requirements from plans, job specifications, codes, relevant Australian Standards, manufacturers’ instructions and jurisdictional requirements.
  • 1.2 Identify and apply workplace, work health and safety (WHS) and environmental requirements.
2 Prepare for work.
  • 2.1 Create a materials list and collect materials.
  • 2.2 Select appropriate tools and equipment including personal protective equipment (PPE).
3 Install and connect fixtures.
  • 3.1 Set out, position, assemble and install sanitary fixtures in accordance with plans, job specifications, codes, relevant Australian Standards, manufacturers’ instructions and jurisdictional requirements.
  • 3.2 Position and install flushing device.
  • 3.3 Flush service lines and connect to fixtures and devices.
  • 3.4 Test water service, fixtures and devices for correct function.
  • 3.5 Adjust controls and devices to operate with even and consistent flow.
  • 3.6 Test installed pipework in accordance with codes, relevant Australian Standards and manufacturers’ instructions.
  • 3.7 Maintain tapset and mixer tap in accordance with relevant Australian Standards, codes and manufacturers’ instructions.
  • 3.8 Complete documentation according to relevant regulatory requirements.
4 Clean up.
  • 4.1 Clear the work area and dispose of, reuse or recycle materials in accordance with state or territory legislation and workplace requirements.
  • 4.2 Clean tools and equipment, check for serviceability and report any damage, and store and secure.
No information
No information
Replaces
State Code National Code Title Type
WF970 CPCPWT3026A Fit off and commission heated and cold water services Unit of competency
WF960 CPCPSN3024A Install and fit off sanitary fixtures Unit of competency
State Code National Code Title Type
BGC2 CPC32420 Certificate III in Plumbing Qualification