Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Tap furnaces
Tap furnaces
Unit of competency
National Code
RIIPSM201D
RIIPSM201D
State Code
WH604
WH604
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
28/05/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
28/05/2014
Nominal Hours
50
Description
This unit describes a participant’s skills and knowledge required to tap furnaces in Metalliferous mining.This unit is appropriate for those working in operational roles. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare for furnace tapping
- 1.1 Access, interpret and apply tap furnaces documentation and ensure the work activity is compliant
- 1.2 Obtain and clarify/confirm verbal and written work instructions before proceeding
- 1.3 Establish and maintain communication with other personnel using approved communication methods
- 1.4 Select and wear personal protective equipment appropriate for work activities
- 1.5 Identify, address and report potential risks, hazards and environmental issues and implement control measures
- 1.6 Obtain and interpret emergency procedures, and be prepared for an emergency
- 1.7 Use approved dust suppression and extraction methods
- 1.8 Ensure adequate ventilation to work area before commencing the work activity Select, and check for faults, tools and equipment for work activities
- 1.9 Set up equipment for tapping
- 1.10 Position holding vessels/ladles to receive molten metal and slag
2. Tap molten metal from furnace
- 2.1 Carry out plant and equipment start-up checks and procedures
- 2.2 Drill, or make tap hole with oxy lance, and establish molten metal flow
- 2.3 Ignite burners and correctly apply to ensure molten metal does not solidify
- 2.4 Identify and control interference with molten metal flow
- 2.5 Ensure quality and production targets
- 2.6 Collect samples at appropriate bath heights for metallurgical testing
3. Complete tapping process
- 3.1 Insert and secure tap-hole seal to stop molten metal flow
- 3.2 Clean and stow all tools and equipment in readiness for next tapping operation
- 3.3 Complete reports and written records
4. Maintain tapping equipment
- 4.1 Obtain and/ manufacture tap-hole seals
- 4.2 Replace temperature monitoring equipment
- 4.3 Remove and install tapping blocks
- 4.4 Provide support for maintenance personnel
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WB478 | RIIPSM201A | Tap furnaces | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AZF3 | RII30415 | Certificate III in Resource Processing | Qualification |
| J649 | RII30413 | Certificate III in Resource Processing | Qualification |
| AZB2 | RII20515 | Certificate II in Resource Processing | Qualification |
| J671 | RII20513 | Certificate II in Resource Processing | Qualification |