Unit of competency Outline

Date retreived
22/07/2026 3:28 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Model fibrous plaster products

Model fibrous plaster products

Unit of competency
National Code
PMC553072
State Code
BAH16
TGA Status
Deleted
DTWD Status
Transition (Deleted)
Current Release Number
1.00
Current Release Date
22/06/2016
State Implementation and Classification
Approved Date
05/08/2016
Field of Education
040317 - Plastering
Original Release Date
05/08/2016
Nominal Hours
60
Description
This unit of competency covers the skills and knowledge required to make a model of a final fibrous plaster product. The model will typically be used as a prototype for future production.This unit of competency applies to plaster modellers or those in similar roles who are required to determine the specifications for the work piece; plan, prepare for and make the model; make adjustments to remedy faults and non-conformity; and solve problems within area of responsibility.This unit of competency applies to an experienced operator demonstrating theoretical and technical knowledge and well developed skills in situations that require some discretion and judgement. The experienced operator may work alone or as a member of a team or group and will work in liaison with other shift team members, team leader and supervisor, as appropriate.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Determine work piece to be produced
  • 1.1 Discuss required attributes of the work piece with supervisor or, as appropriate, the client
  • 1.2 Determine dimensions and geometry of the work piece
  • 1.3 Identify the profile, pattern and specific features required to be replicated
  • 1.4 Establish and/or plan fixing or anchoring points and the best way to facilitate this in the work piece
  • 1.5 Plan the production method and determine materials and equipment needs
2 Set up work area and equipment
  • 2.1 Establish work area, including anchor points for slides or screeds, as necessary
  • 2.2 Develop templates required to produce the work piece
  • 2.3 Mark out the correct dimensions and work piece geometry and check against templates or slide radii
  • 2.4 Establish and position any support materials required to develop and sustain the work piece during production
  • 2.5 Position any lifting or anchoring materials and check that these do not inhibit templates or screeds
  • 2.6 Test the functionality of the slides and ensure that all parts of the proposed work piece can be accessed
3 Generate profile of required work piece
  • 3.1 Produce a segment of the desired profile and ensure that this matches the requirements of the original design
  • 3.2 Mount the sample to facilitate replication or to produce appropriate surface detail on the work piece
  • 3.3 Lubricate the sample for replication and the supporting work plate to facilitate ease of stripping of the completed work piece
4 Produce work piece
  • 4.1 Set up the supporting material in a manner which avoids interference with the screed or template
  • 4.2 Prepare plaster mix and ensure fibre strand is available
  • 4.3 Build up rough outline of the work piece adding fibre as the process proceeds
  • 4.4 Form up the desired shape by moving the sample, template or mould to facilitate development of the desired profile or by screeding off
  • 4.5 Build in anchor points or reinforcing at desired positions as the work proceeds
  • 4.6 Hollow out the work piece to minimise the mass of the object, as appropriate
  • 4.7 Check the profile to ensure compliance with the desired product
  • 4.8 Check the work piece for dimensional accuracy
5 Strip and inspect completed work piece
  • 5.1 Remove any external supports from the work piece after the plaster has dried
  • 5.2 Dismantle slides if used
  • 5.3 Clean and put away tools and fitments used in the production process
  • 5.4 Remove the work piece and inspect for errors, damage or porosity
  • 5.5 Clean up any excrescences and remove any waste material
  • 5.6 Coat the surface of the finished product according to organisational requirements to protect the surface
  • 5.7 Remove finished product to storage and shipment
6 Control hazards
  • 6.1 Identify hazards during the process or within the work area
  • 6.2 Assess the risks arising from those hazards
  • 6.3 Implement measures to control those risks in line with procedures and duty of care
7 Respond to problems
  • 7.1 Identify possible problems in equipment or process
  • 7.2 Determine problems needing action
  • 7.3 Determine possible fault causes
  • 7.4 Rectify problem using appropriate solution within area of responsibility
  • 7.5 Follow through items initiated until final resolution has occurred
  • 7.6 Report problems outside area of responsibility to designated person
No information
No information
Replaces
State Code National Code Title Type
WA967 PMC553072B Model fibrous plaster products Unit of competency