Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Assist with the construction, laying and connection of gas distribution services to mains

Assist with the construction, laying and connection of gas distribution services to mains

Unit of competency
National Code
UEGNSG009
State Code
OEL65
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
09/12/2022
State Implementation and Classification
Approved Date
13/03/2023
Field of Education
030717 - Plant And Machine Operations
Original Release Date
13/03/2023
Nominal Hours
36
Description
This unit involves the skills and knowledge required to assist with the construction, laying and connection of gas distribution services to mains.It includes constructing, laying and connecting a gas distribution service to mains, and completing relevant documentation whilst working under direct supervision. It also includes the use of relevant tools and equipment and working safely in accordance with workplace procedures.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to assist in the construction and laying of a service to a main
  • 1.1 Workplace safety, environmental and sustainable energy practices for the site are identified, obtained and understood
  • 1.2 Job requirements are obtained and interpreted from plans, specifications and instructions
  • 1.3 Relevant job requirements and workplace procedures for work activities are discussed with relevant person/s, including third parties, to determine and confirm work schedule and respective responsibilities
  • 1.4 Hazards are identified, workplace safety and environmental risks are assessed, and control measures are prioritised, implemented and monitored in accordance with workplace procedures
  • 1.5 Scope of responsibility under the relevant job requirements, including all work permits and/or relevant notifications, is determined and confirmed to access the services and perform work in accordance with job requirements and workplace procedures
  • 1.6 Equipment, tools and personal protective equipment (PPE) needed to carry out work activities are identified, obtained and checked for correct operation and safety in accordance with workplace procedures and manufacturer instructions
  • 1.7 Materials, plans, diagrams, drawings and resources required for work are confirmed and obtained in accordance with workplace procedures
2 Assist in the construction and laying of a service to a main
  • 2.1 Workplace safety and environmental risk control measures, schedule of work and workplace procedures for carrying out work are followed
  • 2.2 Appropriate materials, tools and equipment are selected and used safely in accordance with manufacturer instructions and workplace procedures
  • 2.3 Assistance in preparing and trenching the excavation site for laying of pipe is provided in accordance with industry standards and workplace procedures
  • 2.4 Assistance in constructing and laying of gas services is provided in accordance with industry standards and workplace procedures
  • 2.5 Work is completed within agreed timeframe and to industry standards in accordance with job requirements and workplace procedures
  • 2.6 Unplanned events are referred to the relevant person/s for directions in accordance with workplace procedures
3 Complete work and relevant documentation
  • 3.1 Workplace safety risk control measures for work completion are followed
  • 3.2 Quality and safety checks of the work are conducted in accordance with job requirements, workplace procedures and community and industry standards
  • 3.3 Worksite is cleaned, reinstated and made safe in accordance with workplace procedures
  • 3.4 Tools, equipment and any surplus resources/materials are cleaned, checked and securely stored in accordance with workplace procedures
  • 3.5 Incidents are reported and followed up as required in accordance with workplace procedures
  • 3.6 Relevant person/s is notified of work completion in accordance with workplace procedures
  • 3.7 Work completion documentation is completed accurately and provided to relevant person/s in accordance with workplace procedures
No information
No information
State Code National Code Title Type