Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Prepare grid connected photovoltaic power systems for LV connection
Prepare grid connected photovoltaic power systems for LV connection
Unit of competency
National Code
UEENEEK036B
UEENEEK036B
State Code
W8174
W8174
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
11/11/2010
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Original Release Date
11/11/2010
Nominal Hours
36
Description
1)1.1) DescriptorThis competency standard unit covers the preparation of grid connected photovoltaic power systems for connection to an electricity supply grid via an inverter. It encompasses working safely and to installation standards, matching components with that specified for a given location, placing and securing system components accurately, preparing for the required circuit connections and completing the necessary installation documentation.
Notes
Elements and Performance Criteria
1 Prepare grid connect photovoltaic power system components for installation
- 1.1 OHS procedures for a given work area are obtained and understood.
- 1.2 Health and safety risks are identified and established risk control measures and procedures in preparation for the work are followed.
- 1.3 Safety hazards that have not previously been identified are noted and established risk control measures are implemented.
- 1.4 Installation of the system is prepared in consultation with other affected by the work and sequenced appropriately.
- 1.5 The nature and location of the work is determined from documentation or appropriate person to establish the scope of work to be undertaken.
- 1.6 Location of system components is planned within the constraints of the building structure, significants and regulations.
- 1.7 Advice is sought from appropriate persons to ensure the work is co-ordinated effectively with others.
- 1.8 Material needed for the installation work is obtained in accordance with established procedures and checked against job requirements.
- 1.9 Tools, equipment and testing devices needed to for the installation work are obtained in accordance with established procedures and checked for correct operation and safety.
- 1.10 Preparatory work is checked to ensure no unnecessary damage has occurred and complies with requirements.
2 Prepare grid connect photovoltaic power systems components for connection to LV.
- 2.1 OHS risk control measures and procedures for carrying out the work are followed.
- 2.2 The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety and licensing procedures.
- 2.3 Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and licensing procedures.
- 2.4 System components are installed to comply with technical standards and job specifications and requirements with sufficient access to affect terminations, adjustment and maintenance.
- 2.5 Wiring is terminated at components and associated equipment in accordance with manufacture's specifications and functional and regulatory requirements.
- 2.6 Established methods for dealing with unexpected situations are discussed with appropriate person or persons and documented.
- 2.7 Unexpected situations are dealt with safely and with the approval of an authorised person.
- 2.8 On-going checks of the quality of installed apparatus are undertaken in accordance with established procedures.
- 2.9 System installation is carried out efficiently without unnecessary waste of materials or damage to apparatus, circuits, the surrounding environment or services and using sustainable energy principles.
3 Completion and report installation activities.
- 3.1 OHS work completion risk control measures and procedures are followed.
- 3.2 Work site is cleaned and made safe in accordance with established procedures.
- 3.3 Final checks are made so that the installed apparatus conforms to requirements.
- 3.4 'As-installed' apparatus and associated equipment is documented and an appropriate person or persons notified in accordance with established procedures.
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC706 | UEENEEK136A | Install, configure and commission LV micro-hydro systems rated up to 6.4 kW | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W442 | UEE32007 | Certificate III in Renewable Energy ELV | Qualification |