Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install resilient sheet to bench and counter tops

Install resilient sheet to bench and counter tops

Unit of competency
National Code
MSFFL3018
State Code
WI375
TGA Status
Deleted
DTWD Status
Transition (Deleted)
Current Release Number
1.00
Current Release Date
10/12/2013
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
030113 - Cabinet Making
Original Release Date
19/06/2014
Nominal Hours
40
Description
This unit of competency covers installing resilient sheet to bench and counter tops.Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Prepare materials for installation
  • 1.1 Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing resilient sheet to bench and counter tops are verified and complied with
  • 1.2 Instructions and/or plans are read and interpreted to identify process required to complete work tasks
  • 1.3 Substrate condition is assessed for suitability for installation of resilient sheet to the bench/counter top
  • 1.4 Suitable adhesives, trims and accessories are selected
  • 1.5 Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  • 1.6 Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
  • 1.7 The aesthetics of the materials is maximised where appropriate, matching grains, colours and patterns
2 Set out materials
  • 2.1 Resilient sheets to be installed are checked against work order
  • 2.2 Resilient sheets are acclimatised according to manufacturer recommendations
  • 2.3 Resilient sheets for fixing are organised and used in accordance with relevant safety management requirements
  • 2.4 Working lines and starting point are established
  • 2.5 Pre-form fillet is cut and fitted, if required
  • 2.6 Feathering systems and applications are prepared and applied in accordance with the installation plan
3 Install resilient sheet
  • 3.1 Instructions and sequence for laying and fixing is followed
  • 3.2 Resilient sheets are laid out to meet directional sequence, pattern match, specification requirements, and to minimise waste and joins as appropriate
  • 3.3 The aesthetics of the materials is maximised, where appropriate, matching grains, colours and patterns
  • 3.4 Pattern templates of the bench/counter tops are produced, if required
  • 3.5 Resilient sheets are accurately and clearly marked for cutting
  • 3.6 Resilient sheets are cut to required pattern and shape with minimum waste of materials, allowing for final adjustment, trimming and welding processes
  • 3.7 Header and/or perimeter contact adhesive is applied to surfaces
  • 3.8 Resilient sheets are positioned in accordance with the plan, pressed out and hand-rolled
  • 3.9 Resilient sheet is heated to form required profiles
  • 3.10 Seams are prepared and welded in accordance with the plan, manufacturer instructions and industry standards
  • 3.11 Joins and/or seams are trimmed and finished to industry standards
  • 3.12 Completed installation is checked for flaws in installation and materials and faults rectified following workplace procedures
4 Complete housekeeping
  • 4.1 Unused materials are stored or recycled as required
  • 4.2 Tools and equipment are cleaned and stored appropriately
  • 4.3 Work area is cleaned and rubbish disposed of appropriately
  • 4.4 Workplace documentation is completed
No information
No information
Replaces
State Code National Code Title Type
W8568 LMFFL3307A Install resilient sheet to bench and counter tops Unit of competency
State Code National Code Title Type
J736 MSF30813 Certificate III in Flooring Technology Qualification